NASA Readies Orbiters For Upcoming Flights To ISS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 05.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.14.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Sat, Jun 02, 2007

NASA Readies Orbiters For Upcoming Flights To ISS

Atlantis Ready For Launch; Endeavour, Discovery In The Wings

Officials with NASA updated ANN this week on the status of the equipment slated to fly the next three shuttle missions to the International Space Station... Ed.

Mission: STS-117 - 21st International Space Station Flight (13A)
S3/S4 Truss Segment Solar Arrays
Vehicle: Atlantis (OV-104)
Location: Launch Pad 39A
Launch Date: June 8, 2007
Crew: Sturckow, Archambault, Reilly, Swanson, Forrester, Olivas and Anderson Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

At the Launch Readiness Review meeting this week, Space Shuttle Program managers officially set the STS-117 launch date for June 8. At Launch Pad 39A, operations are proceeding on schedule to meet that date. This week, the orbiter, ground and solid rocket booster pyro initiator circuit resistance tests were completed. The orbiter midbody umbilical unit mate operations were also performed. Aft closeout operations are under way, with completion scheduled for this weekend. Stowage of flight crew equipment is in progress, and ordnance installation is complete. This weekend, the orbiter's main engines, orbital maneuvering system and forward reaction control system will be pressurized for flight.

Mission: STS-118 - 22nd International Space Station Flight (13A.1)
S5 Truss Segment
Vehicle: Endeavour (OV-105)
Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Aug. 9, 2007 Launch Pad: 39A
Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

In Orbiter Processing Facility bay No. 2, Endeavour's aero surfaces, such as the elevons, body flaps and rudder speed brake, are configured for modal testing, which checks the structural integrity of the vehicle. Nose landing gear door rigging is nearing completion. Closeout of the orbiter's aft and forward sections is under way. Work is also nearing completion on structural leak checks of the orbital maneuvering system pods, forward compartment and forward reaction control system.

In high bay No. 1 of the Vehicle Assembly Building, stacking of the solid rocket boosters continues for STS-118.

Mission: STS-120 - 23rd International Space Station Flight (10A) -
U.S. Node 2
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3
Launch Date: Targeted for Oct. 20, 2007
Launch Pad: 39A
Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani
Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Testing of the "shuttle to station power transfer system" is complete. Functional testing of the atmospheric revitalization pressure control system, part of the orbiter's life support system, continued this week. Modifications to Discovery's engine cutoff sensor wiring continue, as does the installation of BRI tile around the main landing gear doors and external tank doors.

FMI: www.nasa.gov/shuttle

Advertisement

More News

ANN's Daily Aero-Linx (05.18.13)

Fun Places To Fly All gassed up and no place to go? "Fun Places To Fly" has an ever growing list of Aviation Events and Fun Places to Fly, provided by pilots like you who love avia>[...]

ANN's Daily Aero-Term (05.18.13): Differential Ailerons

Control surface rigged such that the aileron moving up moves a greater distance than the aileron moving down. The up aileron produces extra parasite drag to compensate for the addi>[...]

Aero-News: Quote Of The Day (05.18.13)

"While the IRS will complete open audits, management companies can be secure in the fact that while additional guidance is developed, they will not face potentially crippling tax a>[...]

ANN FAQ: It's Alive! ANN REALTIME NewsBug Headlines for YOUR Desktop!

It's For Real! ANN REALTIME NewsBug Released To ANN Readers, Worldwide For those of you using a windows PC (MAC version in the works... we promise), a new REALTIME News Service fro>[...]

Online Fundraising Campaign Underway To Restore SF Fleet Week Air Show

Crowdfunding Effort Has A Goal Of $800,000 Online fundraising efforts called "Crowdfunding" are all the rage these days, with entrepreneurs using the campaigns to raise money to es>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC