HF120 Turbofan Prototypes Paving Way For Cert Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jul 30, 2008

HF120 Turbofan Prototypes Paving Way For Cert Testing

GE Honda Aero Notes Success Of Aggressive Program

Through rapid engine prototyping, GE Honda Aero Engines has built and tested eight HF120 engine cores and eight full turbofan engine configurations to prepare for formal certification testing later this year, the company said this week at AirVenture 2008.

It represents one of the most aggressive test programs for a new jet engine prior to official FAA certification testing. "We're optimizing the engine configuration before certification testing," said Bill Dwyer, president of GE Honda Aero Engines. "The combined resources of the Honda and GE engineering teams working closely together make this possible."

GE Honda Aero Engines officials say so far, test results are highly encouraging. The HF120 engine has demonstrated more than 2,100 pounds of thrust while exceeding ambitious fuel efficiency and durability targets. Testing and rebuilds of full turbofan engines have been underway at Honda's Aircraft Engine RD Center in Japan for about a year, verifying the engine design's operability, thermal characteristics and component efficiencies.

At the same time, hardware has been released for HF120 engines for the certification program. Testing continues throughout next year with FAA certification targeted for late 2009. Also next year, the engine undergoes flight tests on a flying testbed, as well as on the HondaJet.

The GE Honda HF120 engine was launched in 2006 on the HondaJet advanced light jet and Spectrum Aeronautical "Freedom" business jet, with service entry for both aircraft scheduled in 2010. By service entry, the HF120 is expected to have accumulated more than 15,000 hours of ground and flight testing.

HF120 engine production will begin in 2009 at GE's Lynn, MA facility. Production then transitions to Honda Aero Inc.'s new engine production facility in Burlington, NC which is slated to open for engine deliveries in 2010.

The HF120 engine, rated at 2,095 pounds of thrust, succeeds Honda's original HF118 prototype engine, which has accumulated more than 4,000 hours of testing on the ground and in-flight. GE and Honda redesigned the engine for higher thrust, while seeking new standards of performance in terms of fuel efficiency, durability, and low noise and emissions.

FMI: www.gehonda.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC