Engine Runs Successfully Completed For B747-8 Intercontinental | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.03.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 08.03.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Thu, Mar 10, 2011

Engine Runs Successfully Completed For B747-8 Intercontinental

Engines "Performed As Expected," Boeing Says

Boeing successfully completed the first engine runs for the 747-8 Intercontinental today. The milestone marks a key step in preparing Boeing's largest-ever passenger jet for flight test. "The integrated airplane systems and engines performed as expected," said Elizabeth Lund, vice president and general manager of the 747 program. "This result allows us to continue moving forward to first flight."

Engine runs began at 1157 (PST) Tuesday and lasted approximately two hours and 45 minutes. During initial engine runs, the engines are started and operated at various power settings to ensure all systems perform as expected. The engine run test began with the Auxiliary Power System providing power to start the first of four GE GEnx-2B engines. The remaining three engines were started using the cross-bleed function.

Basic systems checks continued throughout the test. The engines were powered down and inspected and will be restarted following a technical review. The team completed a vibration check and monitored the shutdown logic to ensure it functioned as expected.

The GEnx-2B engine is optimized for the 747-8. The new engine contributes to a reduction in fuel burn, emissions and noise, which gives customers the lowest operating costs and best economics of any large passenger airplane while providing enhanced environmental performance.

FMI: www.boeing.com

Advertisement

More News

A Whole Lot of OSH15 Awesome! 2015 EAA/ANN AirVenture Innovation Preview!

Get The Inside Details On THE Most Exciting NEW OSH15 Innovations And Product Announcements... in High-Def Aero-TV Video The staff of the Experimental Aircraft Association and the >[...]

Aero-News: Quote Of The Day (08.03.15)

"The opportunities for commercial tethered drones for security, infrastructure inspection and disaster response is tremendous and ASEC believes that by harnessing DAC's innovative >[...]

Annual Oshkosh 201 'Best/Worst Of' Award Selection Invites YOUR Participation!

YOU Can Contribute To The Annual List Compiled By The Staff and Readership of the ANN and Aero-TV! E-I-C Note: We're going to start naming names and dropping details in just a few >[...]

Airborne At OSH15 Day 5 Redux: Inhofe's Mission, NextGen GA Fund, New Kitfox

Also: Cicare 8, Switchblade Update, Beringer Alaskan Bush Gear, Jack Pelton Interview - Final E-I-C Note: Regularly Daily Airborne Unlimited Programming will resume this Monday now>[...]

Klyde Morris (08.03.15)

Klyde Finds A-POO Relying on Ted Stryker To Bail Them Out... FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC