FAA Approves Boeing 787 Battery System Design Changes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

AMA Drone Report

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday

Airborne-Thursday

Airborne-Friday

Airborne-Unmanned w/AUVSI

Airborne On ANN

AMA 04.20.17

Airborne
04.24.17

Airborne
04.25.17

Airborne
04.19.17

Airborne
04.20.17

Airborne
04.21.17

Airborne-Unmanned 04.18.17

Airborne-YouTube

AMA 04.20.17

Airborne
04.24.17

Airborne
04.25.17

Airborne
04.19.17

Airborne
04.20.17

Airborne
04.21.17

Airborne-Unmanned 04.18.17

Fri, Apr 19, 2013

FAA Approves Boeing 787 Battery System Design Changes

Instructions To Operators To Be Released Next Week

The FAA has taken the next step in returning the Boeing 787 to flight by approving Boeing's design for modifications to the 787 battery system. The changes are designed to address risks at the battery cell level, the battery level and the aircraft level.

Next week, the FAA will issue instructions to operators for making changes to the aircraft and will publish in the Federal Register the final directive that will allow the 787 to return to service with the battery system modifications. The directive will take effect upon publication. The FAA will require airlines that operate the 787 to install containment and venting systems for the main and auxiliary system batteries, and to replace the batteries and their chargers with modified components.
 
“Safety of the traveling public is our number one priority. These changes to the 787 battery will ensure the safety of the aircraft and its passengers,” said Transportation Secretary Ray LaHood.
 
“A team of FAA certification specialists observed rigorous tests we required Boeing to perform and devoted weeks to reviewing detailed analysis of the design changes to reach this decision,” said FAA Administrator Michael Huerta.
 
To assure proper installation of the new design, the FAA will closely monitor modifications of the aircraft in the U.S. fleet. The FAA will stage teams of inspectors at the modification locations. Any return to service of the modified 787 will only take place after the FAA accepts the work.
 
As the certifying authority, the FAA will continue to support other authorities around the world as they finalize their own acceptance procedures.

Meanwhile, the French news service AFP reports that, according to a report in Japan's Nikkei Business Daily, that country plans to impose stricter safety requirements on the Dreamliner than will be recommended by the FAA. The paper reports that the Japanese transport ministry will require such things as remote monitoring of battery data, like voltage, and will also require more frequent battery inspections. The current requirement is once every two years.

The ministry is reportedly planning to impose those more stringent measures to address concerns about the airplane's safety on the part of the flying public.

The NTSB will hold a two-day investigative hearing into the Jan. 7 Boeing 787 battery fire on April 23-24 in the NTSB’s Board Room and Conference Center Washington, D.C. The hearing will start at 9 a.m. on both days.

Representatives of the FAA, Boeing, GS-Yuasa and Thales will testify and answer questions from NTSB Board members and technical staff about the design, testing, certification and operation of the lithium-ion battery on the Boeing 787 and the battery fire incident.

(NTSB images)

FMI: www.faa.gov, www.mlit.go.jp/english, www.ntsb.gov

Advertisement

More News

AMA Drone Report 04.20.17: Phantom 4 Advanced, NJ NIMBYism, AMA-DJI Team Up

Also: AUVSI XPO17 LIVE!, Steady Drone Sales, Drone v Shotgun... DJI’s new Phantom 4 Advanced offers a more powerful camera and more upgraded controls. The new upgrades the or>[...]

Airborne-Unmanned 04.18.17: Drones v Volcanoes!, Boston Marathon UAVs, XPO-LIVE!

Also: State Pavilions at XPONENTIAL, MQ-8C Fire Scout, Puma UAS, Drone Bust Drones DO wind up in some of the most amazing places... As evidence by the Universities of Bristol and C>[...]

Airborne 04.21.17: Gulfstream G280, Airport $$ Abuse, Boeing Jobs

Also: Drone Power, Jerkwater Drone Regs, CBP, Wichita UAS Mtg, Cessna Accident, Co-Pilot SNAFU, Atlas Air-Polar Air Gulfstream’s super mid-size G280 recently completed two mi>[...]

RFP: ANN Considering Future Options For HQ Relocation

Some Aggressive Upgrades For ANN, Aero-TV, and Airborne May Require New Digs It's been in development for years, but we're getting to a point where we think we can pull off somethi>[...]

Aero-News: Quote of the Day (04.24.17)

"We understand that the hearing will be 8 days before the Planes of Fame Air Show and we want to assure you that your overwhelming support throughout this situation has strengthene>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2017 Web Development & Design by Pauli Systems, LC