FAA To Hilton Head: Runway Less Than 5,000 Feet Not Worth The Cost | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Oct 14, 2010

FAA To Hilton Head: Runway Less Than 5,000 Feet Not Worth The Cost

A 700 Foot Extension Would Preserve Existing commercial Service

The FAA has told Hilton Head Island airport (KHXD) officials that any proposal to extend the runway on the resort island to less than 5,000 feet would receive a cool reception from the agency, and would be difficult to justify in terms of funding.

In a letter sent to county administrator Gary Kubic, the FAA's Scott Seritt said that an extension of less than 700 feet "would not justify the cost."

The argument is a familiar one pitting residents living near the airport against the airports' desire for a longer runway. The Island Packet reports that consultants studied extensions of 300, 700, and 1,100 feet, and some town officials have said that the 700 foot option would preserve the turboprop-based commercial service to the airport, increasing safety for those aircraft while minimizing disruptions to the surrounding residential neighborhoods. But the 5,000 foot runway would still not be sufficient for larger business jets or regional jets operated by the airlines. Regional jets would require a runway of at least 6,500 feet.

The FAA seems to be pushing Hilton Head to go for the longest option studied, a 5,400 foot runway. Seritt said in his letter that if the county does not make the longest possible extension now, the funds for such projects might not be available in the future.


KHXD

The paper reports that county administrator Kubic said the likelihood of reduced federal funding for the shortest option make it "very unlikely," and that a 5,000 foot runway seemed to be a good compromise. He said that the airport does not generate enough revenue to undertake any runway extension without the 95 percent funding offered by the FAA. State and local sources split the remaining 5 percent.

FMI: http://bcgov.net/about-beaufort-county/transportation/hhi-airport/index.php, www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC