QF-16 Drone Arrives In Florida For Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 02.12.18

Airborne-UnManned 02.13.18

Airborne 02.14.18

AMA Drone Report 02.15.18

Airborne 02.16.18

Airborne-YouTube

Airborne 02.12.18

Airborne-UnManned 02.13.18

Airborne 02.14.18

AMA Drone Report 02.15.18

Airborne 02.16.18

Mon, Nov 26, 2012

QF-16 Drone Arrives In Florida For Testing

Unmanned System Will Prepare Warfighters For Tomorrow's Threats

The 53rd Weapons Evaluation Group marked an important milestone in continuing to prepare the warfighter for tomorrow's threats as the first QF-16 drone arrived for developmental testing at Tyndall Air Force Base, FL, Nov. 19. "The work done prior to today and the test work that is forthcoming will enable the Air Force to transition from a 3rd generation, Vietnam-era aerial target performance to 4th generation threat replication and beyond," said Lt. Col. Lance Wilkins, 82nd Aerial Targets Squadron commander.

The QF-16 is a supersonic reusable full-scale aerial target drone modified from an F-16 Fighting Falcon. At this time, the 53rd WEG uses QF-4s, made from 1960s F-4 Phantoms, to conduct their full-scale aerial target missions. The targets allow the Air Force and allied nations to have a realistic understanding of what they could face on the battlefield. "In the imminent future, the QF-16 will take air-to-air testing and evaluation to the next level," Wilkins said. "It will make our American and Allied aircrew, aircraft and weapons more reliable and more lethal. It will serve a new generation of warriors."
 
Boeing Global Services and Support will conduct testing on the QF-16, according to a Boeing press release. The QF-16s will undergo approximately six months of testing to validate their capabilities and ensure compatibility with the Gulf Range Drone Control System, explained group officials. Next, the aircraft will deploy to Holloman Air Force Base, NM, for approximately four more months of integrated testing. When all test milestones are complete, the aircraft will return permanently to the 53rd WEG to complete a transition period in order to achieve initial operational capability at Tyndall AFB. The first production QF-16 is scheduled to be delivered in 2014.
 
As the Air Force prepares 5th generation fighters such as the F-22 Raptor and F-35 Joint Strike Fighter for the next battlespace, the group acts as a safety net to ensure our weapons capability is fully evaluated and understood prior to use in combat, said Col. James Vogel, 53rd WEG commander. "It is a big day," Vogel said. "We are 100 percent behind the road to IOC for the QF-16."
 
The colonel added that the day was only possible with the work of many organizations, all involved Airmen at Tyndall AFB and all contractors.
 
The 53rd WEG, which falls under the 53rd Wing at Eglin AFB, FL, provides the personnel and infrastructure to test and evaluate weapons utilized by the combat air forces of the United States and its allies. The group operates the only full-scale aerial drones in the Defense Department.

(Image provided by USAF)

FMI: www.af.mil

Advertisement

More News

AMA Drone Report 02.15.18: AMA Expo East, Skydio R1, TSB Canada Report

Also: DJI Knowledge Quiz, GoFly Competition, Drone ID Rules Coming, FAA Unenthusiastic About Prosecuting? The Academy of Model Aeronautics will host the annual AMA Expo East at the>[...]

Airborne 02.16.18: R66 Wire-Strike Protection, Elk v Helo, Trump Budget

Also: Red Bull Picks Hartzell, SNC Dream Chaser, CH-53K Demo's Vehicle Lift, Emirates Firms Up A380 Orders Robinson has added wire strike protection provisions to its R66 options l>[...]

Airborne-Unmanned 02.13.18: FAA UAS Symposium, Airbus Delivers, Manned EHANG 184

Also: UAS Pilot Code, FAA Drone Program, SkyWatch Funding, Quantix Hybrid UAS For Farmers The FAA and AUVSI will co-host the 3rd Annual FAA Unmanned Aircraft Systems (UAS) Symposiu>[...]

Aero-News: Quote of the Day (02.19.18)

“We are excited that InstantEye has been selected by the Marines as their squad-level sUAS asset. We worked with the Navy and the Marines for some time as they tested and eva>[...]

ANN's Daily Aero-Linx (02.19.18)

Aero Linx: European Air Law Association (EALA) EALA was established in 1988 with the aim to promote the study of European air law and to provide an open forum for those with an int>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC