QF-16 Drone Arrives In Florida For Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.27.16

Airborne Hi-Def On YouTube

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.27.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Mon, Nov 26, 2012

QF-16 Drone Arrives In Florida For Testing

Unmanned System Will Prepare Warfighters For Tomorrow's Threats

The 53rd Weapons Evaluation Group marked an important milestone in continuing to prepare the warfighter for tomorrow's threats as the first QF-16 drone arrived for developmental testing at Tyndall Air Force Base, FL, Nov. 19. "The work done prior to today and the test work that is forthcoming will enable the Air Force to transition from a 3rd generation, Vietnam-era aerial target performance to 4th generation threat replication and beyond," said Lt. Col. Lance Wilkins, 82nd Aerial Targets Squadron commander.

The QF-16 is a supersonic reusable full-scale aerial target drone modified from an F-16 Fighting Falcon. At this time, the 53rd WEG uses QF-4s, made from 1960s F-4 Phantoms, to conduct their full-scale aerial target missions. The targets allow the Air Force and allied nations to have a realistic understanding of what they could face on the battlefield. "In the imminent future, the QF-16 will take air-to-air testing and evaluation to the next level," Wilkins said. "It will make our American and Allied aircrew, aircraft and weapons more reliable and more lethal. It will serve a new generation of warriors."
 
Boeing Global Services and Support will conduct testing on the QF-16, according to a Boeing press release. The QF-16s will undergo approximately six months of testing to validate their capabilities and ensure compatibility with the Gulf Range Drone Control System, explained group officials. Next, the aircraft will deploy to Holloman Air Force Base, NM, for approximately four more months of integrated testing. When all test milestones are complete, the aircraft will return permanently to the 53rd WEG to complete a transition period in order to achieve initial operational capability at Tyndall AFB. The first production QF-16 is scheduled to be delivered in 2014.
 
As the Air Force prepares 5th generation fighters such as the F-22 Raptor and F-35 Joint Strike Fighter for the next battlespace, the group acts as a safety net to ensure our weapons capability is fully evaluated and understood prior to use in combat, said Col. James Vogel, 53rd WEG commander. "It is a big day," Vogel said. "We are 100 percent behind the road to IOC for the QF-16."
 
The colonel added that the day was only possible with the work of many organizations, all involved Airmen at Tyndall AFB and all contractors.
 
The 53rd WEG, which falls under the 53rd Wing at Eglin AFB, FL, provides the personnel and infrastructure to test and evaluate weapons utilized by the combat air forces of the United States and its allies. The group operates the only full-scale aerial drones in the Defense Department.

(Image provided by USAF)

FMI: www.af.mil

Advertisement

More News

Airborne 05.25.16: Canada SeaPlane Regs, Blimp Downed, Citation Longitude Mated

Also: USAF Hassled, Hummel UltraCruiser, Helo Limits, FAA Video, Greg Connell Accident, Medical Helo Suit, Bombardier's 100th VistaJet Canada is proposing changes to their seaplane>[...]

Icon Steps Back, Admits Curtailed Production Plan

Finally Talking (And Still Hyping), Icon Production Plans Take A Big Hit The following is the text of a release from Icon Aircraft (bluster and all)... ANN Analysis and industry re>[...]

Solar Impulse 2 Is En Route To Lehigh Valley, PA

Atlantic Crossing Next Major Hurdle Solar Impulse 2 (Si2) departed Dayton (OH) International Airport with Bertrand Piccard at the controls, this morning at 0402 local time (UTC-4).>[...]

Icon Controversy Continues, But Icon Has Yet To Speak Up

The Company That Won't Answer Questions, May Finally Have To Do So ANN has been bombarded with info and reports concerning the health and well-being of the Icon Aircraft program...>[...]

ANN's Daily Aero-Linx (05.26.16)

Safety Management System (SMS) This FAA website was created as a public resource for those seeking to learn more about SMS within the aviation industry and the FAA.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC