Sikorsky Receives 2nd Contract To Build Presidential Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Feb 26, 2020

Sikorsky Receives 2nd Contract To Build Presidential Helicopters

VH-92A Test Helicopters Flying And Validating Mission Capabilities

Sikorsky will build six production VH-92A Presidential Helicopters under a contract from the U.S Navy. These helicopters are part of the 23 aircraft program of record for the U.S. Marine Corps. Under the terms of the contract, known as Low Rate Initial Production (LRIP) Lot II, Sikorsky will begin deliveries of six VH-92A helicopters in 2022. The remaining production aircraft will be delivered in 2022 and 2023.

"The program continues to progress on budget and within our planned acquisition timeline," said Col. Eric Ropella, PMA-274 presidential helicopter program manager. "The award of LRIP Lot II reinforces the importance of this Marine Corps no-fail mission especially as we move into the next phase of government testing this year."

The VH-92A test aircraft at Patuxent River, Maryland, have proven their production readiness by undergoing rigorous U.S. government testing and operational assessments, including more than 1,000 flight test hours establishing the aircraft's technical maturity and readiness of its mission systems.                            

Sikorsky has transferred five VH-92A helicopters into government test with the sixth completing modification and entering into government test this spring. The VH-92A program is on track to enter Initial Operational Test and Evaluation (IOT&E) later this year.

"Now that we are ramping up production, the VH-92A program is gaining momentum," said Dave Banquer, Sikorsky VH-92A program director. "This second contract award demonstrates the confidence the U.S. Marine Corps has in Sikorsky's proven ability to deliver and support the next generation Presidential helicopter."

All six of the production aircraft from the first Low Rate Initial Production contract are undergoing modifications at Sikorsky's Stratford, Connecticut plant and are on schedule to begin deliveries in 2021.

Sikorsky and the U.S. Navy integrate mature mission and communication systems into the aircraft. This aircraft provides communication capability to perform the duties of Commander in Chief, Head of State and Chief Executive.

The VH-92A aircraft will provide safe, reliable and capable transportation for the President and Vice President.

This program ensures long term affordability and maintainability by utilizing the FAA certified S-92 aircraft which has industry leading reliability and availability. The S-92 fleet surpassed 1.5 million flight hours in 2019 and averages 14,400 hours of safe flight per month.

"The men and women of Sikorsky treasure our legacy of building and providing helicopter transportation for every President and Commander in Chief since Dwight D. Eisenhower," said Banquer. "We are proud to continue that legacy with the VH-92A helicopter."

(Image provided with Lockheed Martin news release)

FMI: www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC