AD Requires Cycling Of Power On Dreamliners | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Dec 03, 2016

AD Requires Cycling Of Power On Dreamliners

FCMs Could Reset During Flight If Left On More Than 22 Consecutive Days

An Airworthiness Directive published in the Federal Register Friday requires repetitive cycling of either the airplane electrical power or the power to the three flight control modules (FCMs). This AD was prompted by a report indicating that all three FCMs might simultaneously reset if continuously powered on for 22 days on all Boeing 787-8 and 787-9 airplanes.

According to the FAA, reports have been received indicating that an FCM will reset if continuously powered on for 22 days. This condition, if not corrected, could result in simultaneous resets of all three FCMs, which could result in flight control surfaces not moving in response to flight crew inputs for a short time and consequent temporary loss of controllability.

The FAA is requiring compliance with the AD by all 99 Dreamliners registered to U.S. operators within a week.

The FAA considers this AD interim action. Boeing and its suppliers are developing a terminating solution to address the identified unsafe condition. Once this terminating solution is developed, approved, and available, the agency might consider additional rulemaking, according to the published AD.

The Seattle Times reports that in a statement, Boeing said that the AD addresses an issue that it has already been brought to the attention of Dreamliner operators. The company says a permanent software fix "is anticipated in the second quarter of 2017."

An aviation analyst who requested anonymity told the paper that airlines almost never leave a jet powered on for longer than a week.

The FAA estimates that the cost of cycling the power on the airplanes will cost about $85 per airplane per cycle.

(Image from file)

FMI: AD

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC