Navy Conducts COBRA Flight Test From Fire Scout UAV | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Sat, Oct 23, 2010

Navy Conducts COBRA Flight Test From Fire Scout UAV

AN/DVS-1 COBRA System Allows MQ-8B To Conduct Unmanned Aerial Recon In Littoral Areas

The Navy successfully conducted the first flight test of the Coastal Battlefield Reconnaissance and Analysis (COBRA) Block I system at Yuma Proving Ground, AZ on October 13, testing the system's performance on the MQ-8B Fire Scout vertical take-off unmanned aerial vehicle. The AN/DVS-1 COBRA system allows the MQ-8B to conduct unmanned aerial reconnaissance in littoral areas, detecting minefields and obstacles to prepare for amphibious assaults. The Block I upgrade was designed to specifically address the beach zone and inland areas.


Fire Scout UAV During COBRA Test Navy Photo

"COBRA will provide valuable minefield, obstacle, and bathymetry information to the warfighter and amphibious task groups; information which is critical to amphibious assault planning," said Capt. John Hardison, Mine Warfare Programs deputy program manager. "Successful completion of these tests is a significant leap forward in delivering this capability."

The Fire Scout, equipped with COBRA, conducted integration testing and flew for approximately 2 1/2 hours. Several successful tracks were completed in both pre-planned and operator-controlled modes, and the systems conducted simulated missions. Takeoff and landing went without incident, and the system completed all test scenarios.


Fire Scout UAV File Photo

With the successful completion of the first COBRA flight on Fire Scout, the system moves closer to delivery and deployment. The COBRA Block I system will enter low-rate initial production under a Small Business Innovative Research (SBIR) Phase III contract. Under this contract, the first production unit is scheduled for delivery to the fleet in fiscal year 2012.

FMI: www.navy.mil

Advertisement

More News

X-47B Accomplishes Its First Ever Carrier Touch And Go

Maneuver Performed Aboard CVN 77 The Navy's X-47B Unmanned Combat Air System Demonstrator (UCAS-D) began touch and go landing operations aboard the aircraft carrier USS George H.W.>[...]

Honeywell's New HTF7350 Engine To Power Bombardier Challenger 350

HTF7000 Series Surpasses 1.5 Million Flight Hours With Better Than 99 Percent Dispatch Reliability Honeywell has announced that its HTF7350, the latest engine to join its successfu>[...]

Airborne 05.21.13: Cirrus Chute Fails, NASA Record, More NIMBY Nonsense

Also: PC-12 Record, Maule Nation, Cockpit Lockout, 34,000 Airliners Needed, Beechcraft Wins Big Contract You know you're having a bad day when a flight goes so bad that you feel yo>[...]

Helo Crew Missing From Vietnam War Accounted For, Interred At Arlington

Four Buried As A Group May 2 A Navy Pilot, missing from the Vietnam War, has been accounted-for and was buried with full military honors along with his crew. According to the Depar>[...]

ANN's Daily Aero-Linx (05.21.13)

Forest Service Smoke Jumpers Smokejumping was first proposed in 1934 by T.V. Pearson, the Forest Service Intermountain Regional Forester, as a means to quickly provide initial atta>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC