KC-46 Tanker Program Successfully Completes Preliminary Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Thu, May 10, 2012

KC-46 Tanker Program Successfully Completes Preliminary Design Review

Critical Design Review Set For 2013

The KC-46 Tanker program has completed a Preliminary Design Review (PDR) with the U.S. Air Force, a key milestone in the development of the next-generation aerial refueling tanker. The review, which began March 21 and ended April 27, demonstrated that the preliminary design of the KC-46A Tanker meets system requirements and establishes the basis for proceeding with detailed design. Boeing remains on plan to deliver 18 combat-ready KC-46A Tankers by 2017.

"I'm happy with Boeing's performance. They're maintaining a very tight focus on meeting commitments and staying on or ahead of schedule. The program remains on a good path," said Air Force Maj. Gen. Chris Bogdan, KC-46 Program executive officer. "This is important news for the nation's warfighters, because it reaffirms our commitment to delivering the KC-46A tanker on schedule."

The program's next major milestone is a Critical Design Review (CDR) that will take place in the summer of 2013. The CDR will determine that the design of the KC-46A is mature and ready to proceed to the manufacturing phase. "The KC-46 team is designing an aircraft that will offer superior, modern multi-role capabilities for the warfighter, including advanced refueling systems and military avionics, and the ability to transport cargo, passengers and patients," said Maureen Dougherty, Boeing KC-46 Tanker vice president and program manager. "Working closely with our Air Force teammates, we've made tremendous progress in the past 14 months and have the foundation in place to enter the detailed design phase."

In addition to the successful PDR, the Boeing KC-46 team has completed several major milestones on or ahead of schedule over the past year that include a System Requirements Review, Integrated Baseline Review, 767-2C PDR, and Firm Configuration Reviews for the 767-2C and the KC-46A Tanker.

Boeing will build 179 next-generation aerial refueling tanker aircraft that will begin to replace the Air Force's fleet of 416 KC-135 tankers.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.24.13)

Stormbirds A confederation of Luftwaffe-related web sites, providing reference-grade coverage of the Messerschmidt 262 and other advanced combat aircraft of the Third Reich.>[...]

ANN's Daily Aero-Term (05.24.13): Terrain/Obstruction Alert

A safety alert issued by ATC to aircraft under their control if ATC is aware the aircraft is at an altitude which, in the controller's judgment, places the aircraft in unsafe proxi>[...]

Aero-News: Quote Of The Day (05.24.13)

"You have a huge job ahead of you. The challenges are many and the solutions are hard." Source: Senate Commerce Committee Chair Jay Rockefeller (D-WV).>[...]

ANN FAQ: ANN's News Portal Syndication Program

Get A Customized ANN News Portal For YOUR Website! As we promised, the ever-so-busy software geeks at ANN have been working overtime on a number of cool new tools and toys... and t>[...]

AF Seven Summits Team Scales Everest

Effort To Raise Funds And Awareness For The Special Operations Warrior Foundation A group of Airmen with the Air Force Seven Summits team reached the highest point of the world, Mo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC