Look Out Below! ASR Tests eFlyer 2 Parachute Recovery System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 09, 2021

Look Out Below! ASR Tests eFlyer 2 Parachute Recovery System

Tests Will Qualify The eFlyer 2 Parachute System To ASTM Standards

Aviation Safety Resources, Inc. (ASR), has successfully completed the first developmental test of its whole-aircraft parachute recovery system for upcoming eFlyer 2.

Larry Williams, ASR President and CEO, said initial testing was completed at a drop range test facility outside Henderson, Nev., in late February 2021. “This test was the first in a series of tests to qualify the eFlyer 2 parachute system to ASTM standards and make sure the canopy will withstand the load put on it,” he said.

In accordance with ASTM requirements for limit load testing, barrels were filled with water to represent the weight of eFlyer 2. This was the first development test in a series of tests that were dropped from a helicopter at 6,600 feet and accelerated to the maximum speed at which the system will be deployed.

“Everything was perfect,” Williams said. “So far we are getting the results we expected. The next series will advance to ultimate load testing where we will drop 1.15 times the maximum weight and speed for eFlyer 2. This testing represents a real-world environment to make sure the system provides maximum safety and demonstrates the parachute canopy is robust. By exceeding the rated weights and speeds, this provides a critical 1.5X safety factor in accordance with the ASTM and FAA requirements.”

Williams said the ASR team collects a large amount of data during the drops tests that are used to analyze the loads determination calculations to verify the attachment points will withstand the load of the actual deployment. “We look forward to working with the FAA on future certification testing,” he said. “From a teamwork perspective, the coordination with Bye Aerospace has been terrific, and we are progressing right on schedule.”

George E. Bye, CEO of Bye Aerospace, said occupant safety continues to be the highest priority for Bye Aerospace in the design of the eFlyer family of all-electric airplanes. “The whole-aircraft parachute system being designed by ASR for eFlyer 2 is exclusive to the airplane,” he said.

Bye Aerospace has signed an agreement adding 4 eFlyers to its production backlog, now 721 units of eFlyer 2, four-seat eFlyer 4 and soon to be announced 8-seat all-electric aircraft. The company’s current and future families of aircraft feature engineering, research and electric aircraft solutions designed to specifically address compelling market needs. Potential benefits include five-fold lower operating costs, no CO2 emissions, and decreased noise.

FMI: www.aviationsafetyresources.com

Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC