KC-135 Tankers Get A Boost From Innovative, Fuel-Saving Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 11.28.16

Airborne 11.29.16

Airborne 11.30.16

Airborne 12.01.16

Airborne 12.02.16

Airborne Hi-Def On YouTube

Airborne 11.28.16

Airborne 11.29.16

Airborne 11.30.16

Airborne 12.01.16

Airborne 12.02.16

Sun, Jan 27, 2013

KC-135 Tankers Get A Boost From Innovative, Fuel-Saving Engines

Replacement Of Some 1,440 Engines Planned In Upgrade Program

Some decades-old KC-135 Stratotankers are drinking from the fountain of youth -- or at least the engines are. Airmen installed the first of 1,440 upgraded Stratotanker engines at MacDill Air Force Base, Fl, Jan. 15. The 1970s engine parts will be replaced with modern engines that burn less fuel and run longer without repairs, officials said.

"We expect the engine to stay on wing for 20-plus years and take the KC-135 into retirement," said Senior Master Sgt. Dong Kim, Air Mobility Command's propulsion branch chief.
 
Mounting the CFM Propulsion Upgrade Program on KC-135 and Navy E-6B Mercury culminates almost three years of work between Air Mobility Command, Air Force Material Command, the Navy and the original equipment manufacturer, CFM International. The C-PUP engine delivered to MacDill AFB is the first of 15 that will be delivered by General Electric Aviation under an F108 engine augmentation contract.

The refurbished engines upgrade the high pressure compressor and turbine sections of the KC-135's F108 engine, a military variant of the CFM56-2 engine. More than half of the engines on the KC-135 have not seen depot rework since they were initially installed; some dating back to 1984.

The engine depot at Oklahoma City Air Logistics Complex expects to deliver the first organically produced C-PUP engine later this year and is planning to produce 120 annually. The upgrade effort is projected to take 12 years to complete and will affect 1,440 engines, according to officials.

ANN salutes Maj. Mark Blumke Air Mobility Command Directorate of Logistics.

(KC-135 pictured in USAF file photo)

FMI: www.af.mil

Advertisement

More News

Airborne 12.02.16: Stratos 714 1st Flt, TFR Politics, Airbus Job Cuts

Also: Female Skydive Record, ANN November Efforts, Dream Chaser, SecTrans Reax, FAA SAFO, Able Flight, Airline Group Grounded On November 21, the Stratos 714 very light jet took to>[...]

Aero-News: Quote of the Day (12.04.16)

“All three institutions have now sent a strong signal in favour of modernizing the Agency and the European aviation system as a whole. There is clear political will to ensure>[...]

Yingling Aviation Named Garmin Integrated Flight Deck Dealer

Wichita-Based Center Is Authorized To Sell And Install Garmin G1000 Through G5000 Avionics On Broad Range Of Business Aircraft Yingling Aviation has been named a Garmin Integrated >[...]

ANN's Daily Aero-Linx (12.04.16)

Aero Linx: The Colorado Airport Operators Association (CAOA) The Colorado Airport Operators Association (CAOA) serves the common interests of the owners, operators and users of the>[...]

ANN's Daily Aero-Term (12.04.16): Downburst

Downburst A strong downdraft which induces an outburst of damaging winds on or near the ground. Damaging winds, either straight or curved, are highly divergent. The sizes of downbu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC