A380 Begins Ground Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Fri, Apr 08, 2005

A380 Begins Ground Tests

Next Public Event For Behemoth: Paris Air Show

The world's biggest passenger plane -- the Airbus A380 -- began its first full day of ground tests Thursday, but probably won't make its maiden flight until later this month.

That could come between April 14th and 19th, according to company officials. In the meantime, the flight test crew is conducting acceleration and braking tests, determining the aircraft's performance on the runway before taking to the air.

The world got a brief look at the A380 in January as it was rolled out of its hangar for photographers. The next public display comes this summer, when the super-jumbo goes on display at the Paris Air Show.

“I can only tell you that this plane will be at Le Bourget. It won’t make a flying display, despite what some people have said, simply because this isn’t an aerobatic aircraft,” Airbus operations chief Gerard Blanc told Reuters. "It will be at Le Bourget from June 11 for a static presentation, but it won’t stay until the end of the (June 13-19) air show for the simple reason that it will be in test-flight mode, which is a period when every hour of work conducted on the plane is precious."

The A380 was reportedly scheduled to fly early this month. But developmental issues held up the taxi tests, setting the whole schedule behind a bit.

When the A380 enters service next year, it will be capable of carrying between 555 and 853 passengers, depending on the cabin layout. Some airports are rushing construction to accomodate the behemoth. Other airport officials say they just don't have the money to widen runways and change terminal configurations as required by the huge aircraft.

FMI: www.airbus.com

Advertisement

More News

X-47B Accomplishes Its First Ever Carrier Touch And Go

Maneuver Performed Aboard CVN 77 The Navy's X-47B Unmanned Combat Air System Demonstrator (UCAS-D) began touch and go landing operations aboard the aircraft carrier USS George H.W.>[...]

Honeywell's New HTF7350 Engine To Power Bombardier Challenger 350

HTF7000 Series Surpasses 1.5 Million Flight Hours With Better Than 99 Percent Dispatch Reliability Honeywell has announced that its HTF7350, the latest engine to join its successfu>[...]

Airborne 05.21.13: Cirrus Chute Fails, NASA Record, More NIMBY Nonsense

Also: PC-12 Record, Maule Nation, Cockpit Lockout, 34,000 Airliners Needed, Beechcraft Wins Big Contract You know you're having a bad day when a flight goes so bad that you feel yo>[...]

Helo Crew Missing From Vietnam War Accounted For, Interred At Arlington

Four Buried As A Group May 2 A Navy Pilot, missing from the Vietnam War, has been accounted-for and was buried with full military honors along with his crew. According to the Depar>[...]

ANN's Daily Aero-Linx (05.21.13)

Forest Service Smoke Jumpers Smokejumping was first proposed in 1934 by T.V. Pearson, the Forest Service Intermountain Regional Forester, as a means to quickly provide initial atta>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC