First Flyable A350 XWB 'MSN-001' Structurally Complete | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.24.15

Airborne 08.25.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.28.15

Airborne Hi-Def On YouTube

Airborne 08.24.15

Airborne 08.25.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.28.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Wed, Dec 05, 2012

First Flyable A350 XWB 'MSN-001' Structurally Complete

Aircraft Makes Its 1st Journey 'On Wheels'

Airbus has successfully completed the main structural assembly and system connection of A350 XWB ‘MSN-001’ – the first flight-test aircraft. The aircraft is shown here on its wheels for the very first time moving out of the main assembly hall (Station 40) at the recently inaugurated “Roger Béteille” A350 XWB Final Assembly Line in Toulouse. It then entered the adjacent indoor ground test station (Station 30).

The assembly work performed in Station 40 included the successful electrical power-on of the aircraft's entire fuselage and wings. Soon work in Station 30 will start by testing the aircraft's hydraulic system, followed by the full electric and hydraulic power-on of the aircraft which will be completed by around the end of the year. This will mark the start of several weeks of comprehensive functional system testing.

After the A350 XWB MSN-001 exits station 30, the aircraft will go through a series of extensive production and certification / development tests, be painted and have its engines installed. It will then be delivered to the flight-line and be readied for its first flight in mid-2013.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

Airborne 08.27.15: Golden Wings Flying Museum, AUVSI v CA, FAA Delays Pilot DB

Also: Join The API!, ATC Goofs... Badly, Shuttle Water Tanks, Herlong Rebrands FBO, Gogo's Next Generation, China A/C Demand, Chatham MA RFP You won’t see us run very many fo>[...]

Boeing Completes 777X Firm Configuration

Milestone Establishes Basic Airplane Design; Program On Track For First Delivery In 2020 Boeing has completed the firm configuration milestone for the 777-9, the first member of th>[...]

Airborne 08.26.15: New U-2?, Carter PAV Update, AK TFR Concerns

Also: Skydive Mid-Air, Classic Aero-TV, United Airlines, Forest Service Policy v Helicopters, WestJet Pilots' Association, NASA Drops Plane, Flightnow in Court Is it possible that >[...]

Airborne 08.27.15: Golden Wings Flying Museum, AUVSI v CA, FAA Delays Pilot DB

Also: Join The API!, ATC Goofs... Badly, Shuttle Water Tanks, Herlong Rebrands FBO, Gogo's Next Generation, China A/C Demand, Chatham MA RFP You won’t see us run very many fo>[...]

AD: Airbus Airplanes

AD NUMBER: AD 2015-17-07 PRODUCT: All Airbus Model A300 B4-603, B4-605R, B4-620, B4-622, B4-622R airplanes; all Airbus Model A300 C4-605R Variant F airplanes; and certain Airbus Mo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC