Boeing Rolls Out First 777 At Increased Production Rate | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Sat, Jan 12, 2013

Boeing Rolls Out First 777 At Increased Production Rate

New Rate Is Highest Ever For A Boeing Twin-Aisle Airplane

Boeing has rolled out the first 777 to be built at the increased production rate of 8.3 per month, or 100 airplanes per year. The airplane is a 777 Freighter that will be delivered in February to Korean Air.

The production increase began in October when the first airplane parts entered the Everett factory. Planning for the increased rate has been in work for almost a year. "As we built the first airplane at the new rate, we saw some of the best production metrics ever," said Scott Fancher, vice president and general manager, 777 program and Airplane Development. "Our factory is running smoothly and we've reduced the time it takes to build a 777 by one day from 49 to 48 days."

New manufacturing innovations such as flex-track drilling in the body and wing panels, automated floor drilling and wings painting equipment also contributed.

"Employee involvement teams have been critical to the rate increase," Fancher said. "Ideas from those teams are saving time while improving quality and safety."

In the past 31 months, the 777 program has increased rate two times. First from five to an all-time high production rate of seven in 2011, and now going beyond that to an all-time high rate of  8.3 airplanes per month.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

Airborne At OSH15 Day 5 Redux: Inhofe's Mission, NextGen GA Fund, New Kitfox

Also: Cicare 8, Switchblade Update, Beringer Alaskan Bush Gear, Jack Pelton Interview - Final E-I-C Note: Regularly Daily Airborne Unlimited Programming will resume this Monday now>[...]

ANN's Daily Aero-Linx (08.01.15)

The BD-5 Web Site The official home of the BD-5 network, the purpose of this web site is to provide information about the Bede Aircraft BD-5, an experimental, homebuilt, single-sea>[...]

ANN's Daily Aero-Term (08.01.15): Notice To Airmen (NOTAM)

A notice containing information (not known sufficiently in advance to publicize by other means) concerning the establishment, condition, or change in any component (facility, servi>[...]

Aero-News: Quote Of The Day (08.01.15)

"The fairing separation is one of our very first critical events. If it doesn't work as planned, it's probable the mission cannot continue." Source: Mike Hawes, Lockheed Martin Ori>[...]

ANN FAQ: Aero-Twitters Offer Instant Alerts For Breaking News

Say Hello To Aero-Twitter! Twitter is designed to work on a mobile phone as well as on a computer (and can be accessed via your IM clients). All Twitter messages (called "Tweets", >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC