SASC Chair Levin: Lockheed Needs Pressure To Keep JSF Costs Down | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 06.18.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.18.13 **

** AIRBORNE 06.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 06.14.13**

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Thu, Jun 21, 2012

SASC Chair Levin: Lockheed Needs Pressure To Keep JSF Costs Down

First Contracts Already Exceeding Combined Target By $1 Billion

U.S. Senator Carl Levin (D-MI) (pictured), chair of the Senate Armed Services Committee, says that Lockheed Martin needs some pressure to keep the costs of the F-35 JSF program from soaring further out of control.

"We have to keep the pressure on," Levin said in a recent interview. "We've got to have contracts which are fixed-price. We have to make reductions."

Bloomberg Business Week reports that LMC has already spent $1 billion more than its target costs for the first four contracts for 63 airplanes. A U.S. GAO report released last week indicates that Washington will have to spend $12.7 billion per year, on average, through 2037 for the F-35 program. Pentagon officials told reporters in March that the "lifecycle cost" from development through production of 2,443 airplanes and support over 55 years, is now up to $1.51 trillion. Levin said he has "plenty of concerns" about the Pentagon's efforts to control costs, and said the F-18 is a "backup" to the JSF.

Lockheed CEO Robert Stevens told Bloomberg Business Week that Senator Levin's points are valid, and "we want to get this program right."

Meanwile, Frank Kendal, the Pentagon's undersecretary for acquisition, said in a presentation in February that "putting the F-35 in production years before the first flight test was acquisition malpractice. It should not have been done, but we did it." But Stevens said that every aircraft development program overlaps with its production. Otherwise, he says it would be totally obsolete before the first airplane was built.

The GAO report concludes that Over the last two years, the JSF program has undergone extensive restructuring that places it on a more achievable course, albeit a lengthier and more expensive one. At the same time, the near-constant churn (change) in cost, schedule, and performance expectations has hampered oversight and insight into the program, in particular the ability to firmly assess progress and prospects for future success. Going forward, it will be imperative to bring stability to the program and provide a firm understanding of near- and far-term financial requirements so that all parties—the Congress, Defense Department, and international partners—can reasonably set priorities and make informed decisions amid a tough fiscal environment.

The JSF remains the critical centerpiece of DOD’s long-term tactical aircraft portfolio. System development of the aircraft and engine ongoing for over a decade, continue to experience significant challenges. The program’s strategic framework, laden with concurrency, has proved to be problematic and ultimately, a very costly approach. DOD over the past year has identified substantial cost overruns attributed to relatively poor execution in production and specific concurrency-related inefficiencies. There is risk of future cost growth from test discoveries driving changes to design and manufacturing processes. Effectively managing software and the global supply chain is critical to improving program outcomes, increasing manufacturing throughput, and enabling future expansion of JSF procurement.

FMI: www.dod.gov, www.lockheenmartin.com, www.gao.gov

Advertisement

More News

Aero-TV: Garmin’s GNC-255 –- Back To Basics

Garmin's New Aviation VHF Radios Early this year, a new series of aviation VHF COM and NAV/COM radios, the GTR and GNC series, was announced by Garmin. As the replacement products >[...]

EADS And Siemens Enter Long-Term Research Partnership

Sign MoU With Diamond Aircraft On Electric Propulsion System EADS and Siemens are entering into a long-term research partnership to introduce new electric propulsion systems that c>[...]

ANN's Daily Aero-Term (06.19.13): Ceiling

The heights above the earth's surface of the lowest layer of clouds or obscuring phenomena that is reported as broken, overcast, or obscuration, and not classified as thin or parti>[...]

ANN's Daily Aero-Linx (06.19.13)

The Army Aviation Heritage Foundation The Army Aviation Heritage Foundation (AAHF) is a non-profit public educational foundation dedicated to presenting the Army Aviation story to >[...]

Aero-News: Quote Of The Day (06.19.13)

“The serial electric propulsion allows us to design airplanes with totally different characteristics than today. Vertical take-off and high-speed cruise can be realized in a >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC