Soyuz Is In The Launch Zone At Europe's Spaceport | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 05.14.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.14.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Tue, May 03, 2011

Soyuz Is In The Launch Zone At Europe's Spaceport

First Russian-Designed Spacecraft To Launch From French Guiana

The latest addition to Arianespace's launcher family made its world debut Monday at the vehicle's new base of operations, as the first Soyuz was rolled out to the Spaceport's launch pad in French Guiana. The Russian-built medium-lift workhorse vehicle emerged from its MIK integration facility in the Spaceport's northwest zone early Monday morning for a 1,900 foot transfer to the launch zone.

It marked the start of a "dry run" validation of procedures that will replicate all aspects of a Soyuz mission's typical multi-day final preparation phase at the Spaceport - except for the vehicle's actual fueling. For this dry run, the process will continue to the final countdown on May 4, when it will be purposely stopped - allowing procedures to be confirmed in the scenario of a launch-day interruption. The final countdown will be resumed on May 5, with a simulated liftoff and downrange mission trajectory.

The vehicle involved in this exercise is a flight-worthy launcher that will be used for a future mission after Soyuz enters service beginning later this year. It is one of two launchers that have been delivered from Russia to French Guiana. Based on the processing flow established for Soyuz missions at the Spaceport, the three-stage launcher had been horizontally integrated in the MIK facility and was rolled out to the launch zone on a transporter/erector rail car.

The Soyuz vehicle - composed of its four first-stage strap-on boosters, the Block A core second stage, and the Block I third stage - was then raised into position over the massive concrete launch pad by the transporter/erector, where it was then suspended in position with the use of the launch pad's four primary support arms at mid-day.

During the afternoon hours, the 170-foot-tall mobile gantry that was developed specifically for Soyuz operations at the Spaceport moved into position around the vehicle, allowing delivery and integration of the launcher's upper composite in the evening. This upper composite consists of a Fregat upper stage and the ST-type payload fairing. For the dry-run exercise, the upper composite did not contain an actual payload.

FMI: http://www.arianespace.com/index/index.asp

Advertisement

More News

Aero-Help Wanted: ANN Needs A Good Honest Marketing Manager

ANN/Aero-TV Marketing Department Needs Part or Full Time Personnel Since ANN started, we have enjoyed the amazing support of a group of sponsors who have, by and large, been genero>[...]

Aero-News: Quote Of The Day (05.20.13)

"On his last day in the country he gave his life for, Tyler was working on his RV-8 at the EAA hangar. He spoke to (chapter member) Vance Simons, who had become a friend since he i>[...]

Klyde Morris (05.20.13)

Klyde Does 'Drone' On... FMI: www.klydemorris.com>[...]

Airborne 05.17.13: X-47B Carrier Launch, New CAF Base, Space Oddity... For Real

Also: Wanna Buy A Control Tower?, SAC 7-35 Airdata Computer, Remembering Frank Beagle, Exp 35 Astros Drop In, 777X Team Named, AF Academy Grads Will Get Their Flyover! The X-47B Un>[...]

Flight Test Engineer Turns Real-Life Experience Into New Novel

Historical Fiction Set Against Invasion Of Kuwait In 1990 In order to succeed in his invasion of Kuwait on August 2, 1990, Saddam Hussein needed weapons. Weapons lead to questions:>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC