Sikorsky Selects CH-53K Fuselage Supplier Team | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Thu, May 10, 2007

Sikorsky Selects CH-53K Fuselage Supplier Team

Four Companies Awarded Bids Following 12-Month Competition

Sikorsky Aircraft announced Wednesday it has selected four subcontractors to design and fabricate the major fuselage sections for its new CH-53K heavy-lift helicopter currently under development for the United States Marine Corps.

Sikorsky's Fuselage Team will consist of Aurora Flight Sciences, EDO Corp., GKN Aerospace, and Spirit AeroSystems. They were selected following an extensive solicitation and evaluation of multiple bids over a 12-month competition.

"Sikorsky is pleased to welcome four new team members to the CH-53K helicopter program. This evaluation was one of the most complex undertaken by Sikorsky to date, and we are confident that the sources selected provide the best value and lowest risk for our Marine Corps customer. The combination of Aurora, EDO, GKN, and Spirit brings world class capability, experience and innovation to the CH-53K team," said Dave Haines, Sikorsky's CH-53K Program Manager.

These selected sources will design and manufacture the CH-53K primary and secondary structures. Sikorsky will conduct the integration and test program on the complete fuselage structure. The major subcontracted sections include the cockpit and cabin (Spirit), aft transition (GKN), tail rotor pylon and sponsons (EDO), and main rotor pylon (Aurora). The fuselage development program will employ the latest advanced design tools, manufacturing processes and materials.

Design will be conducted in a collaborative environment between supplier sites and Sikorsky's Heavy Lift Development Center using model management systems paired with Sikorsky data collaboration and knowledge management systems. Composite and titanium materials are being employed extensively to provide superior fatigue and corrosion durability at minimum weight. State-of-the-art manufacturing processes such as co-curing, automated part fabrication, super high speed machining, and determinant assembly are intended to make the structure very affordable.

Under the System Development and Demonstration (SDD) contract, Sikorsky is responsible for selecting and managing the subsystem suppliers. Other major subsystems recently awarded on the program include the engines, fly-by-wire flight controls, and electric power system. Additional major subsystem awards anticipated in the coming months will be for the secondary power system, landing gear, hydraulic, fuel, and drive systems.
The SDD contract is expected to lead to production of 156 CH-53K aircraft to replace the CH-53E Super Stallion helicopters currently in the Marine Corps' inventory.

Sikorsky tells ANN the three-engine Sikorsky CH-53E Super Stallion is the largest, most powerful maritime helicopter in the world. It is deployed from Marine Corps amphibious assault ships to transport personnel and equipment, and to carry external (slung) cargo loads. The CH-53K will maintain virtually the same footprint as the CH-53E, but will nearly double the payload to 27,000 pounds over 110 nautical miles under "hot high" ambient conditions. The CH-53K's maximum gross weight will increase to 84,700 pounds from 72,500 pounds for the CH-53E.

The CH-53K also is expected to result in reduced operation and support costs. Upgrades include joint interoperable glass cockpit; fly-by-wire flight controls; fourth generation rotor blades with anhedral tip; low-maintenance elastomeric rotorhead; gross weight expansion; upgraded engine system; cargo rail locking system; external cargo handling improvements; and survivability enhancements.

FMI: www.sikorsky.com

Advertisement

More News

X-47B Accomplishes Its First Ever Carrier Touch And Go

Maneuver Performed Aboard CVN 77 The Navy's X-47B Unmanned Combat Air System Demonstrator (UCAS-D) began touch and go landing operations aboard the aircraft carrier USS George H.W.>[...]

Honeywell's New HTF7350 Engine To Power Bombardier Challenger 350

HTF7000 Series Surpasses 1.5 Million Flight Hours With Better Than 99 Percent Dispatch Reliability Honeywell has announced that its HTF7350, the latest engine to join its successfu>[...]

Airborne 05.21.13: Cirrus Chute Fails, NASA Record, More NIMBY Nonsense

Also: PC-12 Record, Maule Nation, Cockpit Lockout, 34,000 Airliners Needed, Beechcraft Wins Big Contract You know you're having a bad day when a flight goes so bad that you feel yo>[...]

Helo Crew Missing From Vietnam War Accounted For, Interred At Arlington

Four Buried As A Group May 2 A Navy Pilot, missing from the Vietnam War, has been accounted-for and was buried with full military honors along with his crew. According to the Depar>[...]

ANN's Daily Aero-Linx (05.21.13)

Forest Service Smoke Jumpers Smokejumping was first proposed in 1934 by T.V. Pearson, the Forest Service Intermountain Regional Forester, as a means to quickly provide initial atta>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC