P&W Geared Turbofan Demonstrator Completes Phase I Ground Tests Early | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Feb 15, 2008

P&W Geared Turbofan Demonstrator Completes Phase I Ground Tests Early

Results So Far Have Been "Outstanding"

Pratt & Whitney tells ANN the company has successfully completed Phase I sea-level performance and acoustic testing on the full-scale Geared Turbofan demonstrator engine ahead of schedule. The engine will now be configured with the flight nacelle system for Phase II ground testing beginning in April in preparation for flight testing on Pratt & Whitney's 747SP flying test bed in mid-2008.

"The Geared Turbofan engine's performance has been outstanding and all initial test results have validated the game-changing benefits of this new product," said Bob Saia, vice president, Pratt & Whitney Next Generation Product Family. "The initial results surpassed our pre-test predictions, demonstrating the fuel burn, noise and emissions characteristics of this new architecture. We look forward to fully analyzing all of the data from these initial tests and entering into the next phase of the development program."

The Geared Turbofan demonstrator engine has logged a total of 130 hours since ground testing began in November 2007. Running from idle to full power, Phase I testing validated the design of the fan, low pressure compressor, fan drive gear system and thermal management system to demonstrate the Geared Turbofan engine's operational efficiency.

"Testing conducted to validate the thermal management system showed engine operating temperatures cooler than predicted," added Saia. "These test results will enable our design engineers to optimize the thermal management system to further reduce weight and simplify placement of external accessories on the engine."

Phase II of the Geared Turbofan engine's ground test program will continue in West Palm Beach, FL through May before being installed on Pratt & Whitney's 747SP flying test bed for flight testing.

The Geared Turbofan demonstrator engine is part of Pratt & Whitney's overall technology readiness program to power the next generation of commercial aircraft. The company is actively testing key components of the Geared Turbofan engine on 15 test rigs worldwide. The Geared Turbofan engine is expected to set new standards in environmental and operational engine performance.

In 2007, Pratt & Whitney's Geared Turbofan engine was selected as the exclusive power for the new Mitsubishi Regional Jet and the Bombardier CSeries. If launched, both aircraft are scheduled to enter service in 2013.

In a Geared Turbofan engine, a state-of-the-art gear system allows the engine's fan to operate independent of the low-pressure compressor and turbine, resulting in greater fuel efficiency and a slower fan speed for less noise. The Geared Turbofan engine builds on more than 20 years of technology development with improvements in every major module.

Pratt & Whitney has over 17,000 aircraft engines installed with hundreds of airlines throughout the world. Additionally, Pratt & Whitney is a leading partner in two joint venture companies that manufacture commercial aircraft engines: International Aero Engines, which makes the V2500 for the Airbus A320 family of aircraft, and the Engine Alliance, whose GP7200 engine is FAR 33 certified for the new Airbus A380.

FMI: www.pw.utc.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC