P&W Geared Turbofan Demonstrator Completes Phase I Ground Tests Early | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 10.29.14 ** HD iPad-Friendly -- Airborne 10.29.14 **
** Airborne 10.27.14 ** HD iPad-Friendly -- Airborne 10.27.14 **
** Airborne/NBAA2014 10.24.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.24.14 **

Fri, Feb 15, 2008

P&W Geared Turbofan Demonstrator Completes Phase I Ground Tests Early

Results So Far Have Been "Outstanding"

Pratt & Whitney tells ANN the company has successfully completed Phase I sea-level performance and acoustic testing on the full-scale Geared Turbofan demonstrator engine ahead of schedule. The engine will now be configured with the flight nacelle system for Phase II ground testing beginning in April in preparation for flight testing on Pratt & Whitney's 747SP flying test bed in mid-2008.

"The Geared Turbofan engine's performance has been outstanding and all initial test results have validated the game-changing benefits of this new product," said Bob Saia, vice president, Pratt & Whitney Next Generation Product Family. "The initial results surpassed our pre-test predictions, demonstrating the fuel burn, noise and emissions characteristics of this new architecture. We look forward to fully analyzing all of the data from these initial tests and entering into the next phase of the development program."

The Geared Turbofan demonstrator engine has logged a total of 130 hours since ground testing began in November 2007. Running from idle to full power, Phase I testing validated the design of the fan, low pressure compressor, fan drive gear system and thermal management system to demonstrate the Geared Turbofan engine's operational efficiency.

"Testing conducted to validate the thermal management system showed engine operating temperatures cooler than predicted," added Saia. "These test results will enable our design engineers to optimize the thermal management system to further reduce weight and simplify placement of external accessories on the engine."

Phase II of the Geared Turbofan engine's ground test program will continue in West Palm Beach, FL through May before being installed on Pratt & Whitney's 747SP flying test bed for flight testing.

The Geared Turbofan demonstrator engine is part of Pratt & Whitney's overall technology readiness program to power the next generation of commercial aircraft. The company is actively testing key components of the Geared Turbofan engine on 15 test rigs worldwide. The Geared Turbofan engine is expected to set new standards in environmental and operational engine performance.

In 2007, Pratt & Whitney's Geared Turbofan engine was selected as the exclusive power for the new Mitsubishi Regional Jet and the Bombardier CSeries. If launched, both aircraft are scheduled to enter service in 2013.

In a Geared Turbofan engine, a state-of-the-art gear system allows the engine's fan to operate independent of the low-pressure compressor and turbine, resulting in greater fuel efficiency and a slower fan speed for less noise. The Geared Turbofan engine builds on more than 20 years of technology development with improvements in every major module.

Pratt & Whitney has over 17,000 aircraft engines installed with hundreds of airlines throughout the world. Additionally, Pratt & Whitney is a leading partner in two joint venture companies that manufacture commercial aircraft engines: International Aero Engines, which makes the V2500 for the Airbus A320 family of aircraft, and the Engine Alliance, whose GP7200 engine is FAR 33 certified for the new Airbus A380.

FMI: www.pw.utc.com

Advertisement

More News

Airborne 10.29.14: Antares Launch Failure, GAMA Responds, Another 'Roadable'???

Also: Dragon Returns, Quadcopter Flown At Airliner?, Classic Aero-TV: Redhawk, Diesel Flt School Airplanes, WWII Bomber Found The unmanned Antares rocket built by Orbital Science C>[...]

Antares ISS Resupply Mission Suffers Launch Failure

Vehicle Suffers Failure Just Seconds Into Launch Sequence Analysis By ANN Space Correspondent, Wes Oleszewski At approximately 18:22:38.651 Eastern time, the two AJ-26 first stage >[...]

Airborne 10.27.14: New Freefall Altitude Record, NBAA14 Wrap-Up, Falcon AOG

Also: New ALPA Officers, Hurricane Hunters, Aventura AVW, New Runway at Copiah County, LTC Tom Dougherty Flies West Only 2 years ago, Felix Baumgartner set a record for the highest>[...]

Airborne 10.29.14: Antares Launch Failure, GAMA Responds, Another 'Roadable'???

Also: Dragon Returns, Quadcopter Flown At Airliner?, Classic Aero-TV: Redhawk, Diesel Flt School Airplanes, WWII Bomber Found The unmanned Antares rocket built by Orbital Science C>[...]

U.K. Ministry Of Defense Makes $2.42 Billion Air Traffic Management Deal

Contract Awarded To Joint Venture Between Thales And NATS AQUILA, a joint venture between Thales and NATS, has been awarded the £1.5 billion (approx. $2.42 billion) contract,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC