Qatar Airways Grounds One Of Its Three Dreamliners | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Mon, Dec 17, 2012

Qatar Airways Grounds One Of Its Three Dreamliners

Airplane Developed An Electrical Problem Similar To One That Cropped Up On A UCH 787

Qatar Airways says it has been forced to ground one of its three Dreamliners because of an electrical problem that forced them to take the jet out of service. A similar problem was discovered recently in a 787 belonging to United Continental Holdings.

Qatar Airways CEO Akbar Al Baker was not pleased. He said in an interview at Heathrow in London Thursday that the airline would "demand compensation from Boeing," according to a report from Reuters.

The airplane was grounded December 9th. Al Baker said that the airplane would not fly until Boeing had repaired the aircraft, which the company said it was working to get done. But the planemaker said it was not certain that the issue was with a power generator, as was the case with a Dreamliner belonging to United Continental which was forced to make an emergency landing December 4 when one of the three units on board failed.

Boeing said it would "evaluate the findings in Qatar" to get to the root cause of the problem before determining what the next steps should be.

Al Baker said that he was concerned that having similar problems occur on such new airplanes could be a symptom of wider problems with the jet. He blamed the Dreamliner's delays for slowing the airline's expansion plans.

Qatar Airways has 60 Dreamliners on order, with the next deliveries scheduled for December 19th.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

Airborne At OSH15 Day 5 Redux: Inhofe's Mission, NextGen GA Fund, New Kitfox

Also: Cicare 8, Switchblade Update, Beringer Alaskan Bush Gear, Jack Pelton Interview - Final E-I-C Note: Regularly Daily Airborne Unlimited Programming will resume this Monday now>[...]

Klyde Morris 07.31.15

Precision Targeting, Or Just Blind Luck? FMI: www.klydemorris.com>[...]

AD: Turbomeca S.A. Turboshaft Engines

AD NUMBER: 2015-13-04 PRODUCT: All Turbomeca S.A. Arriel 1A1, 1A2, 1B, 1C, 1C1, 1C2, 1D, 1D1, 1E2, 1K1, 1S, 1S1, 2B, 2B1, 2C, 2C1, 2C2, 2S1, and 2S2 turboshaft engines.>[...]

AD: The Boeing Company Airplanes

AD NUMBER: 2015-13-06 PRODUCT: Certain Boeing Model 747-400 and 747-400F series airplanes.>[...]

ANN's Daily Aero-Linx (07.31.15)

KRnet - Mailing List for KR Experimental Aircraft Builders and Pilots KRnet is a free Internet mailing list devoted to helping KR builders and pilots to construct and fly their KR >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC