ISS: It's A Good Week For Spacewalks | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Mar 21, 2005

ISS: It's A Good Week For Spacewalks

ISS Status Report #14, Mission Control Center, Houston

The crew aboard the International Space Station turned its attention to spacewalks this week with repair and preparatory work in two airlocks.

Expedition 10 Commander Leroy Chiao spent the beginning of the week installing a new heat exchanger in Quest, the U.S. airlock. Working meticulously with stubborn bolts and attachments, Chiao swapped out the faulty heat exchanger with a new unit delivered earlier this month.

The job sets the stage to restore use of Quest as a base for spacewalks using U.S. spacesuits. The heat exchanger unit provides cooling for the U.S. spacesuits while they are connected to the airlock. Chiao finished the repair ahead of schedule and had spare time to work on several other tasks around the Station, such as replacing a hard drive in a laptop computer.

Flight Engineer Salizhan Sharipov began preparing the Russian Pirs Docking Compartment, which also serves as a Russian airlock, for the second and final spacewalk the pair will conduct. Chiao assisted by gathering U.S. tools, such as helmet lights and a tool caddy, which they will use in conjunction with the Russian equipment. They also gathered antennas and cabling they will install during the spacewalk. Sharipov and Chiao are scheduled to step outside March 28 for nearly six hours to continue the external outfitting of the Space Station and deploy a German satellite experiment.

Sharipov did further troubleshooting on the Elektron oxygen-generating system, which ran intermittently throughout the week. Its periodic shutdowns have caused no concern for the replenishment of oxygen in the Station cabin. Russian experts will continue to monitor its condition. The Elektron, which converts water into oxygen, is one of several methods that can be used to provide oxygen in the Station cabin.

Two control moment gyroscopes (CMGs) are maintaining the Station’s orientation after a third gyroscope lost power on Wednesday. A circuit breaker, called a Remote Power Controller, failed and removed power from that gyroscope. Attempts to reset the breaker were unsuccessful. There is no impact to current Station activities. Two gyros are adequate to maintain the orientation of the complex.

Specialists are continuing to evaluate the condition of the circuit breaker. The circuit breaker could be replaced by conducting a spacewalk to perform that work, but the plans and timing of that activity remain to be determined. A fourth gyroscope that failed in June 2002 is set to be replaced on the Space Shuttle's Return to Flight mission, STS-114, this spring.

Also this week, the Station crew slid into their seats inside the attached Soyuz spacecraft to check their fit. The Soyuz seats are outfitted with customized cushions to protect the riders during landing. The fit of the cushions is checked periodically throughout the mission to ensure a comfortable and safe seat home for the crew. Chiao and Sharipov have about five weeks remaining until their return to Earth, with their undocking and landing in Kazakhstan scheduled for April 25.

FMI: http://spaceflight.nasa.gov/

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC