Boeing Phantom Eye Completes Taxi Tests, Readies For Return To Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.17.14 ** HD iPad-Friendly -- Airborne 09.17.14 **
** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **
** Airborne 09.12.14 ** HD iPad-Friendly -- Airborne 09.12.14 **

Mon, Feb 11, 2013

Boeing Phantom Eye Completes Taxi Tests, Readies For Return To Flight

High-Altitude, Long-Endurance Aircraft Also Receives Software Upgrades

Boeing's liquid hydrogen-powered Phantom Eye unmanned aircraft system has completed taxi testing at Edwards Air Force Base in California as it progresses toward its second flight. During the testing, which occurred Feb. 6, the Phantom Eye demonstrator aircraft sitting atop its launch cart reached speeds up to 40 knots, or approximately 46 miles per hour.

The Phantom Eye team has also completed software and hardware upgrades to prepare for flying at higher altitudes. "We upgraded the autonomous flight systems and have achieved all the required test points in preparation for the next flight," said Drew Mallow, Phantom Eye program manager.
 
Additionally, the team improved the aircraft’s landing system following Phantom Eye's first flight, when the landing gear dug into the Edwards lakebed and broke. "We've drawn on Boeing’s experience to come up with a solution, using our tactical fighter aircraft landing systems as an example," said Brad Shaw, Phantom Eye chief engineer.
 
Phantom Eye's innovative and environmentally responsible liquid-hydrogen propulsion system will allow the aircraft to stay on station for up to four days while providing persistent monitoring over large areas at a ceiling of up to 65,000 feet, creating only water as a byproduct. The demonstrator, with its 150-foot wingspan, is capable of carrying a 450-pound payload. Its first flight, in coordination with NASA's Dryden Flight Research Center at Edwards, was in June 2012.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2013-15-06 PRODUCT: Certain Bombardier, Inc. Model DHC-8-102, -103, -106, -201, -202, -301, -311, and –315 airplanes.>[...]

AD: Dassault Aviation Airplanes

AD NUMBER: 2013-26-05 PRODUCT: All Dassault Aviation Model FAN JET FALCON, FAN JET FALCON SERIES C, D, E, F, and G airplanes; Model MYSTERE-FALCON 200 airplanes; and Model MYSTERE->[...]

ANN's Daily Aero-Linx (09.17.14)

Learn to Fly Blog This blog features writings by aviation authors and flight instructors.>[...]

ANN's Daily Aero-Term (09.17.14): Base Turn

A turn executed by the aircraft during the initial approach between the end of the outbound track and the beginning of the intermediate or final approach track.>[...]

Aero-News: Quote Of The Day (09.17.14)

“In the near future, general aviation manufacturers will be able to certify their products more efficiently and effectively, meaning more safety in more airplanes.” Sou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC