GA-ASI Maximizing Fuel Capacity For MQ-25 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Jul 14, 2018

GA-ASI Maximizing Fuel Capacity For MQ-25

Integrated Fuel Tank Structure Improves Fuel Carriage And Delivery Capacity

General Atomics Aeronautical Systems, Inc. (GA-ASI) is using an integrated fuel tank structure to maximize fuel offload for the proposed MQ-25 unmanned aerial refueling aircraft for the U.S. Navy. GA-ASI applied its knowledge of advanced composite aircraft structures to develop integrated fuel tanks in a large-scale wing box test article and a full-scale wing skin pre-production validation article.

The wing box tested to failure via wing bending at GA-ASI’s Adelanto, Calif. structural test facility in November 2017. In April, the company verified the production readiness of the co-cured wing and tail components using both non-destructive and destructive inspections.

“The integral fuel tank wing box test article will reduce technical and schedule risk for the program,” said David R. Alexander, president, Aircraft Systems, GA-ASI. “Specifically, through extensive validation of fuel containment sealing methods, advanced non-linear buckling finite element analysis models and thick composite laminate construction, we have accelerated engineering design consideration prior to the detail design phase and production.”

A full-scale inner-wing skin demonstration article built in March at GA-ASI’s Spanish Fork, Utah facility verified the MQ-25 tooling concepts, lamination approach, and processes. The team validated the outer mold line tooling approach for the build process which enables accelerated engineering and tooling fabrication for the MQ-25 program.

(Source: GA-ASI news release. Image from file)

FMI: www.ga-asi.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC