Air Force Announces KC-46A Candidate Bases | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 02.19.18

Airborne-UnManned 02.20.18

Airborne 02.14.18

AMA Drone Report 02.15.18

Airborne 02.16.18

Airborne-YouTube

Airborne 02.19.18

Airborne-UnManned 02.20.18

Airborne 02.14.18

AMA Drone Report 02.15.18

Airborne 02.16.18

Fri, Jan 11, 2013

Air Force Announces KC-46A Candidate Bases

Next Step Includes Extensive 'On-The-Ground' Surveys Of Each Location

The U.S. Air Force has announced its candidates for active duty, training, and ANG bases for the KC-46A tanker which is expected to come online beginning in FY2016.

Altus Air Force Base, OK, and McConnell AFB, KS, are candidate bases for the KC-46A formal training unit (FTU). Altus AFB, Fairchild AFB, WA, Grand Forks AFB, ND, and McConnell AFB, are candidate bases for the first active-duty led KC-46A main operating base (MOB 1). Forbes Air Guard Station, KS, Joint-Base McGuire-Dix-Lakehurst, NJ, Pease Air Guard Station, NH, Pittsburgh International Airport Air Guard Station, PA, and Rickenbacker Air Guard Station, OH, are candidate bases for the first Air National Guard led KC-46A main operating base (MOB 2).
 
"The KC-46A will have enhanced refueling capacity and capabilities, improved efficiency, and increased capabilities for cargo and aeromedical evacuation as compared to the KC-135R, making it a vital component to maintaining our global reach for years to come," said Gen. Mark Welsh III, Air Force chief of staff.
 
The major commands will conduct detailed, on-the-ground site surveys of each candidate base. They will assess each location against operational and training requirements, potential impacts to existing missions, housing, infrastructure, and manpower. Additionally they will develop cost estimates to bed down the KC-46A for each candidate base. Once the site surveys are completed, the results will be briefed to the secretary of the Air Force and chief of staff of the Air Force to select preferred and reasonable alternatives for the FTU and two operating locations. The Air Force plans to announce KC-46A preferred and reasonable alternatives and begin the Environmental Impact Analysis Process in spring 2013.
 
"Bringing the KC-46A online is an important step in recapitalizing a tanker fleet that has been a leader in air refueling for more than five decades," Welsh said. "This new age aircraft will achieve better mission-capable rates with less maintenance downtime, improving our ability to respond with rapid, global capability to assist U.S., joint, allied and coalition forces and better support humanitarian missions."

Welsh went on to explain that the 179 planned KC-46A aircraft are just the first phase of a 3-phase effort to replace more than 400 KC-135 and 59 KC-10 aircraft. The first phase of tanker recapitalization will complete deliveries in fiscal 2028. He went on to emphasize the importance of continuing KC-135 modernization efforts. "I want to stress that the KC-135 units not replaced with the KC-46A will continue to fly the KC-135R for the foreseeable future," Welsh said. "Throughout tanker recapitalization, the Air Force is committed to ensuring continued support of combatant commander requirements."
 
"We are committed to executing a deliberate, repeatable and standardized basing process," said Kathleen Ferguson, Air Force principal deputy assistant secretary for installations, environment and logistics. "In this process, the Air Force uses criteria-based analysis and military judgment in its decision making. We look forward to the next phase when preferred and reasonable alternatives are announced and our candidate base communities have an opportunity to participate by providing input for the environmental impact analysis."
 
The KC-46A will provide improved capability, including boom and drogue refueling on the same sortie, worldwide navigation and communication, airlift capability on the entire main deck floor, receiver air refueling, improved force protection and survivability, and multi-point air refueling capability.
 
The FTU and MOB 1 will begin receiving aircraft in fiscal 2016. MOB 2 will receive aircraft in fiscal 2018.

(USAF Images)

FMI: www.af.mil

Advertisement

More News

Airborne 02.19.18: TruTrak Vizion Approvals, 737 MAX 9 Cert, Airplane Loan Scam

Also: Frasca Celebrates 60 Years, Klyde’s 40th!, European Plan For AvSafety, Texas Aviation Hall Of Fame The STC for the TruTrak Vizion autopilot has been updated to include >[...]

Airborne 02.19.18: TruTrak Vizion Approvals, 737 MAX 9 Cert, Airplane Loan Scam

Also: Frasca Celebrates 60 Years, Klyde’s 40th!, European Plan For AvSafety, Texas Aviation Hall Of Fame The STC for the TruTrak Vizion autopilot has been updated to include >[...]

Airborne-Unmanned 02.13.18: FAA UAS Symposium, Airbus Delivers, Manned EHANG 184

Also: UAS Pilot Code, FAA Drone Program, SkyWatch Funding, Quantix Hybrid UAS For Farmers The FAA and AUVSI will co-host the 3rd Annual FAA Unmanned Aircraft Systems (UAS) Symposiu>[...]

AMA Drone Report 02.15.18: AMA Expo East, Skydio R1, TSB Canada Report

Also: DJI Knowledge Quiz, GoFly Competition, Drone ID Rules Coming, FAA Unenthusiastic About Prosecuting? The Academy of Model Aeronautics will host the annual AMA Expo East at the>[...]

Airborne 02.16.18: R66 Wire-Strike Protection, Elk v Helo, Trump Budget

Also: Red Bull Picks Hartzell, SNC Dream Chaser, CH-53K Demo's Vehicle Lift, Emirates Firms Up A380 Orders Robinson has added wire strike protection provisions to its R66 options l>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC