Fourth Gulfstream G600 Test Aircraft Makes First Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 27, 2017

Fourth Gulfstream G600 Test Aircraft Makes First Flight

Production Aircraft In Completions For Interior Outfitting

The fourth Gulfstream G600 aircraft recently completed its debut flight just over six weeks after the third aircraft flew for the first time.

The G600 departed Savannah-Hilton Head International Airport at 6:50 p.m. June 21. During the 1-hour and 18-minute flight, the aircraft climbed to a maximum altitude of 51,000 feet and reached a maximum airspeed of Mach .925. The aircraft landed back in Savannah at 8:08 p.m. local time.

“To have four first flights and fly more than 570 hours in less than six months is a remarkable achievement,” said Dan Nale, senior vice president, Programs, Engineering and Test, Gulfstream. “The rapid maturity of this program is due to the work we did before the flying even started — the strategic planning, the research, the lab development — combined with the success we’ve had in the similar G500 program. Thanks to our concurrent flight-test programs, we can apply lessons learned from the more mature G500 program to the G600, resulting in a more streamlined certification effort.”

The fifth G600 test aircraft was recently delivered to the Savannah Completions center, where it will be transformed into a fully outfitted production aircraft. During flight test the aircraft will be used to validate interior elements and ensure the successful integration of aircraft systems with the passenger experience.

To date, the G600 program’s four test aircraft have accumulated more than 130 flights.

Gulfstream is on schedule to receive FAA type certification for the G600 in 2018, with customer deliveries scheduled for later in the year. As previously announced, the all-new, award-winning G500 is on schedule to achieve FAA type certification and enter service in the fourth quarter of this year.

(Image provided with Gulfstream news release)

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Linx (04.17.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Association of the Aerospace Medical Association is organized exclusively for charitable, educational, and scientific>[...]

ANN's Daily Aero-Term (04.17.24): Jamming

Jamming Denotes emissions that do not mimic Global Navigation Satellite System (GNSS) signals (e.g., GPS and WAAS), but rather interfere with the civil receiver's ability to acquir>[...]

ANN's Daily Aero-Linx (04.18.24)

Aero Linx: Warbirds of America The EAA Warbirds of America, a division of the Experimental Aircraft Association in Oshkosh, Wisconsin, is a family of owners, pilots and enthusiasts>[...]

Aero-News: Quote of the Day (04.18.24)

"From New York to Paris, this life-size replica of the Webb Telescope inspired communities around the world and, in doing so, invited friends and families to explore the cosmos tog>[...]

ANN's Daily Aero-Term (04.18.24): Hold-In-Lieu Of Procedure Turn

Hold-In-Lieu Of Procedure Turn A hold-in-lieu of procedure turn shall be established over a final or intermediate fix when an approach can be made from a properly aligned holding p>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC