Winston-Salem Air Show Falls Victim To Airport Construction | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Dec 01, 2015

Winston-Salem Air Show Falls Victim To Airport Construction

Smith Reynolds Airport Receives $1.8 Million AIP Grant For Ramp Upgrades

The Winston-Salem Air Show has been cancelled for 2016, but the reason is not falling revenues or poor attendance.

Rather, the Forsyth County, NC Airport Commission decided to cancel the show when it was awarded a $1.8 million AIP grant to repave and reconstruct the ramp area at the main terminal, which is part of the airport's master plan.

But the Winston-Salem Journal reports that the timing of the project would conflict with the air show, and rather than miss the opportunity for the grant, the board voted to cancel the event so that the project could be completed in a timely manner. Chairman Thomas McKim told the paper that the board "just made the judgment that we couldn’t pass up the opportunity for this significant grant of funds to do a capital project.”

The ramp area at the terminal is where many of the display aircraft are parked for the show, and there would be pedestrian traffic through the construction zone. While McKim feels that the air show is an important showcase for the airport with the general public, occasionally things come up that make staging the show difficult. "This is one of those year," he said.

Air show director Steve Flippin will also lose his job in connection with the cancellation. Flippin has been organizing the show on a contract basis since 2008, and McKim said he has done a "great job" putting on the show. But with no air show next year, the board determined that it would not renew his contract.

There has been no determination whether the show will return in 2017.

FMI: www.smithreynolds.org/commission

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC