Assembly Of 1,000th 777 Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Airborne Unlimited-
Monday

Airborne-Unmanned w/AUVSI-
Tuesday

Airborne Unlimited-
Wednesday

AMA Drone Report-
Thursday

Airborne Unlimited-
Friday

Airborne On ANN

Airborne 06.18.18

Airborne-UnManned 06.19.18

Airborne 06.20.18

AMA Drone Report 06.21.18

Airborne 06.15.18

Airborne-YouTube

Airborne 06.18.18

Airborne-UnManned 06.19.18

Airborne 06.20.18

AMA Drone Report 06.21.18

Airborne 06.15.18

Fri, Nov 11, 2011

Assembly Of 1,000th 777 Underway

Program Reaches Milestone Faster Than Any Other Twin-Aisle Airplane

Workers began assembling the 1,000th 777 on Wednesday. The airplane, a Boeing 777-300ER, will be delivered to Dubai-based Emirates Airline in March 2012.

Production began with loading of the 97-foot wing spar – the main support structure for the wing – into a giant tool that automatically drills, measures and installs more than 5,000 fasteners into the spar. The spar components are built in Auburn, WA.

"We reached this milestone in only 16 years, eight years sooner than the runner up the 747, because of the enormous popularity of the airplane by the airlines that operate it, and the passengers who fly on it," said Larry Loftis, vice president and general manager of the 777 program. "Sixty-four airlines have ordered 1,295 777s. The numbers prove that the 777 is the world's preferred airplane. In fact, it's preferred 1,000 times over." 

A ceremony to mark the start of production was held today in Everett. Additional employee thank-you events will be held as the airplane moves through the 49-day build process. "We couldn't have reached this milestone without the innovation and inspiration of the thousands of employees here at Boeing and at the more than 500 suppliers around the globe that build the 777," Loftis said. "We thank them and honor them for their contribution to aviation history," he said.

Emirates is the largest 777 customer with 95 777s currently in its fleet; the 1,000th 777 will be its 102nd.

FMI: www.boeing.com

Advertisement

More News

Airborne 06.18.18: XP-82 Twin Mustang, Tuskegee Airmen, Supersonic Reg Change

Also: Thunderbirds/Snowbirds To N TX, AK Mid-Air, Gogo AVANCE L5, Sikorsky's New Parts Supply Site The restorers of a North American XP-82 “Twin Mustang,” one of the mo>[...]

Airborne-Unmanned 06.19.18: Mexican UAV Fights Crime, Spokane Drones, Ikhana!

Also: K2 & Robotic Skies, Autonomous Aerial Vehicles Competition, K State Grad Cert, Commercial Drones at JFK A drone operated by authorities in Ensenada, Mexico, led to a sign>[...]

AMA Drone Report 06.14.18: AMA Expo W Drone Races, Ag v Drones, Kitty Hawk Flyer

Also: Drone Rotor Safety System, Birds Inspire Drone Design, UAVs Stop Crime, Fat Shark 101 As previously noted, the upcoming AMA Expo West Tradeshow not only starts early, but in >[...]

It's On--Again! EAA/ANN Announce 2018 AirVenture Innovation Preview!

Stunningly Successful Innovation Program Draws Hundreds of Thousands of Eyeballs to ‘All Things AirVenture’ E-I-C Note: We're tremendously excited to work with EAA agai>[...]

Aero-News AirVenture Update: This Is So Cool! #OSH18COOL

We Need YOUR Help To Find AND Celebrate The Coolest Stuff At EAA AirVenture 2018, #OSH18COOL Stuff that’s new is cool… we get it… that’s why we’re b>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2018 Web Development & Design by Pauli Systems, LC