AD: Sikorsky Aircraft Corporation Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.20.16

Airborne Hi-Def On YouTube

Airborne 05.23.16

Airborne 05.24.16

Airborne 05.25.16

Airborne 05.26.16

Airborne 05.20.16

AEA2016 LIVE Aero-TV: 04/27-0830ET, 04/28-1400ET, 04/29-1100ET

Sun 'n Fun 2016 Innovation Preview on Vimeo!

Sun 'n Fun 2016 Innovation Preview on YouTube!

Fri, Mar 29, 2013

AD: Sikorsky Aircraft Corporation Helicopters

AD NUMBER: 2013-05-17

PRODUCT: Sikorsky Aircraft Corporation (Sikorsky) Model S-61A, D, E, L, N, NM, R, and V helicopters.
SUBJECT: Airworthiness Directive 2013-05-17
ACTION: Final Rule

SUMMARY:  This AD requires the replacement of each forward and aft fuel system 40 micron fuel filter element with a 10 micron nominal (40 micron absolute) fuel filter element.

This AD was prompted by a National Transportation Safety Board (NTSB) review of in-service events where engine performance degradation occurred, and the review determined that some of these events were caused by contaminants larger than 10 microns present in the engine fuel control units (FCUs).

The actions are intended to prevent particulate contamination in the FCU, which could lead to malfunction of an internal valve, power loss at a critical phase of flight, and loss of control of the helicopter.

DATES: This AD is effective April 26, 2013.

FMI: AD

Advertisement

More News

Airborne 05.25.16: Canada SeaPlane Regs, Blimp Downed, Citation Longitude Mated

Also: USAF Hassled, Hummel UltraCruiser, Helo Limits, FAA Video, Greg Connell Accident, Medical Helo Suit, Bombardier's 100th VistaJet Canada is proposing changes to their seaplane>[...]

Icon Steps Back, Admits Curtailed Production Plan

Finally Talking (And Still Hyping), Icon Production Plans Take A Big Hit The following is the text of a release from Icon Aircraft (bluster and all)... ANN Analysis and industry re>[...]

Solar Impulse 2 Is En Route To Lehigh Valley, PA

Atlantic Crossing Next Major Hurdle Solar Impulse 2 (Si2) departed Dayton (OH) International Airport with Bertrand Piccard at the controls, this morning at 0402 local time (UTC-4).>[...]

Icon Controversy Continues, But Icon Has Yet To Speak Up

The Company That Won't Answer Questions, May Finally Have To Do So ANN has been bombarded with info and reports concerning the health and well-being of the Icon Aircraft program...>[...]

ANN's Daily Aero-Linx (05.26.16)

Safety Management System (SMS) This FAA website was created as a public resource for those seeking to learn more about SMS within the aviation industry and the FAA.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2016 Web Development & Design by Pauli Systems, LC