Northrop Grumman UAV Completes Critical Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Sat, Dec 03, 2005

Northrop Grumman UAV Completes Critical Design Review

Scheduled To Fly By End Of 2006

Northrop Grumman Corporation tells Aero-News the company has successfully conducted a critical design review of its MQ-8B Fire Scout unmanned aerial vehicle (UAV) for the US Navy.  The review moves the program closer to full-scale production and delivery of the vertical takeoff and landing (VTOL) UAV to the Navy.

"The teamwork shown by the integrated US Navy and Northrop Grumman program team resulted in an excellent and well-coordinated design review," said Cmdr. Rob Murphy, the Navy's team lead for the Fire Scout program. "The long hours of preparation really paid off."

The review brought together the Northrop Grumman Fire Scout team, the Navy and U.S. Army program teams, Navy representatives for Littoral Combat Ship integration and members of the Army's Future Combat System program. Both services have been closely involved in the design to maximize commonality across the Fire Scout platforms.

The technical review process covered every aspect of the UAV to ensure it meets all current and future requirements. Specifically, the review included air-vehicle design, avionics and payload architecture, communications and data links, ship- and land-based launch and recovery and the ability to integrate future payloads onto the aircraft.

"Working with our Navy counterparts, the Fire Scout program continues to mature into a capable and supportable asset for the warfighter," said Doug Fronius, Northrop Grumman's program director for the Navy Fire Scout.
 
Final assembly of the Fire Scout air vehicles will take place at Northrop Grumman's new manufacturing facility in Moss Point, MS. The first airframe is scheduled to arrive there in January from Schweizer Aircraft Corp., a major supplier.

Following assembly, ground testing and first flight are scheduled to be completed in late 2006.

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Linx (05.25.13)

Three-Eight Charlie If you know the name of the first woman to fly solo around the world, you’re ahead of most people. By the way, if you thought it was Amelia Earhart, you&r>[...]

ANN's Daily Aero-Term (05.25.13): Holding Pattern

Holding pattern. A racetrack pattern, involving two turns and two legs, used to keep an aircraft within a prescribed airspace with respect to a geographic fix.>[...]

Aero-News: Quote Of The Day (05.25.13)

“We need a world-class system of weather prediction in the United States – one, as the National Academy of Sciences recently put it, that is ‘second to none'." So>[...]

ANN FAQ: Share Aero-News With Your Friends

Send Them A Story -- We Don't Mind! Do you need another set of eyes to see that story you can't believe Jim just wrote? Want to spread Hognose's unique wisdom and perspective to th>[...]

Flight Attendant Union Endorses Ed Markey For U.S. Senate

Cites 'Strong Record On Aviation Security' The Association of Flight Attendants-CWA (AFA) has endorsed Congressman Ed Markey for the U.S. Senate, specifically noting his proven rec>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC