The E-Fan X Puts Its Aerodynamic Design To The Test | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Mar 16, 2020

The E-Fan X Puts Its Aerodynamic Design To The Test

How Wind Tunnel Testing Is Essential To Preparing For The Demonstrator’s First Flight

Wind tunnel testing is a critical milestone for any aircraft. For the E-Fan X, the test program has offered invaluable insight into the hybrid-electric demonstrator’s aerodynamic design, low-speed performance and handling qualities in preparation for its first flight in 2021.

It’s an early July morning in Filton, UK, and a flurry of activity is underway at Airbus’ wind tunnel test centre. A scale model of a BAe 146 RJ100—a short-haul regional airliner originally designed in the 1980s—is being attached to the Filton wind tunnel in preparation for testing. In fact, it is the same wind tunnel model used in the certification of the original BAe 146 RJ100 aircraft.

But this test model is not exactly like the original. “The BAe 146 RJ100 aircraft is not designed to have hybrid-electric systems on board. We’re trying to take something that exists and turn it into a hybrid-electric demonstrator,” said Anna Calder, E-Fan X Overall Aircraft Design Engineer.

The E-Fan X is Airbus’ hybrid-electric demonstrator. In the test aircraft based on the BAe 146 RJ100, one of the four jet engines will be replaced by a 2MW motor. Other modifications to the BAe 146 RJ100 include the addition of large, externally mounted heat exchangers for liquid cooling systems, as well as intakes and an exhaust for the fuselage-mounted power generation system. If the E-Fan X is to embark on its first flight in 2021, engineers must understand how these modifications will impact the aircraft’s overall aerodynamic performance and handling qualities. And wind tunnel testing can provide invaluable insight in this respect.

Wind tunnels are tubes in which powerful fans are used to exert force and pressure on a scale model of an aircraft. The air moving around the static test model helps engineers to understand how a real aircraft would react to this pressure when flying. All Airbus aircraft undergo wind tunnel testing in preparation for flight. In addition to aircraft, spacecraft and rockets also undergo wind tunnel testing.

During its testing, the E-Fan X was attached to the Filton low-speed wind tunnel, whose test section measures 12 x 10 feet. Giant fans expelled air at speeds of up to 216 mph. Small threads attached to the test model enabled engineers to analyse the movement of air from a variety of angles. At a 1:8 scale model, the E-Fan X was tested at a wingspan of over 10 feet.

“The E-Fan X is an aircraft demonstrator, so it’s not optimised for aerodynamic design,” says Oliver Family, Airbus Head of Overall Aircraft Design, E-Fan X. “But to fly the demonstrator safely and efficiently, the aerodynamics impacts need to be fully understood.”

For Airbus engineers, the key takeaway from wind tunnel testing is a better understanding of the E-Fan X’s overall aerodynamic design. In addition, the test program offered insight on all aspects relating to low-speed performance and handling qualities.

“The only change we discovered during the test program is that we need to modify the porosity of some of the devices inside the ducts to ensure they relate correctly to the full-scale E-Fan X model devices,” says Paul Gingell, Airbus Wind Tunnel Test Engineer.

Successful completion of wind tunnel testing marks another key milestone in the E-Fan X’s development. Future milestones include flight tests for characterisation and installation of the 2MW motor on the test aircraft in 2020.

(Images provided with Airbus news release)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC