Payload Integrations Completed For Next Ariane 5 Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Mon, Jul 02, 2012

Payload Integrations Completed For Next Ariane 5 Flight

Launch Scheduled For July 5th

The EchoStar XVII telecommunications platform has joined its MSG-3 co-passenger on Arianespace’s third Ariane 5 for launch in 2012, marking a key preparation milestone for this July 5 heavy-lift mission from the Spaceport in French Guiana. Encapsulated in its payload fairing, EchoStar XVII was lowered into place yesterday over the MSG-3 meteorological satellite – which was installed atop Ariane 5’s cryogenic core stage earlier in the week. The latest integration activity was performed inside the Spaceport’s launch vehicle Final Assembly Building.

With this new milestone, the Ariane 5’s dual payload “stack” has now been completed, clearing the way for final steps that will include functional tests, launch rehearsal and launch vehicle arming – followed by a readiness review and rollout to the Spaceport’s launch zone for an evening liftoff on July 5. Ariane 5 is to deliver a payload lift performance of more than 21,000 pounds. during the upcoming mission, which includes a combined total of over 16,500 lbs. for the EchoStar XVII and MSG-3 spacecraft, plus the launch vehicle’s dual-passenger dispenser system and satellite integration hardware.
 
EchoStar XVII – which is based on Space Systems/Loral’s powerful 1300 series satellite platform – will be operated by Hughes Network Systems, and it is to deliver broadband services to consumers, businesses and government customers across North America. Weighing approximately 13,448 lbs. at liftoff, the spacecraft employs a multi-spot beam, bent-pipe Ka-band architecture that provides significant additional capacity for Hughes.

MSG-3 was produced by an industry consortium led by Thales Alenia Space, for operation by EUMETSAT (the European Organisation for the Exploitation of Meteorological Satellites).  It has a liftoff mass of approximately 2,000 kg., and will operate in geostationary orbit after its deployment by Ariane 5 – providing highly detailed imagery of Europe, the North Atlantic and Africa for use by meteorologists and national weather forecasters.

(Image provided by Arianespace)

FMI: www.arianespace.com

Advertisement

More News

Update: Startling... FAA Wants EAA To Pay Them To Staff Oshkosh

Could The FAA Get ANY Stranger? Worse Yet... Will They? ANN RealTime News Update, 1324ET, 05.23.13: Well... the statement we were promised YESTERDAY showed up today... and it doesn>[...]

Aspen Avionics Evolution Backup Display Expands To Piper Archer, Seminole

Aspen’s All Digital Backup Display Will Give Flight-Training Students The Total Glass Panel Experience Aspen Avionics announced Tuesday that Piper Aircraft has selected the E>[...]

Classic Aero-TV: EAA’s Jack Pelton – ‘Everything’s Going to Be OK’

Building A New Future For The EAA... One Issue At A Time Originally WebCast 11.14.12: With only a couple of weeks in pocket, directing the reorganization of the EAA in the wake of >[...]

House Committee Hearing Focuses On Strategic Stepping Stones To Mars

Subcommittee Chair Call Mars Mission A Congressional Priority The House Science Committee Subcommittee on Space held a hearing Tuesday to examine possible options for the next step>[...]

Dassault Falcon Embarks On Spares Pricing Overhaul

Third Such Restructuring In 10 Years Dassault Falcon has embarked on its third parts pricing overhaul in the past 10 years, assessing the cost of over 18,500 individual items. The >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC