Set In Stone ... Well ... Composites | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.24.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.24.13 **

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Sat, Jul 03, 2010

Set In Stone ... Well ... Composites

Boeing Completes Firm Configuration Of 787-9 Dreamliner

Boeing announced Thursday that it has completed the firm configuration for the 787-9 Dreamliner. The announcement comes after years of collaboration with airline customers and partners to determine the optimal configuration for the new stretch version of the Dreamliner.

"Firm configuration means the airplane's structural, propulsion and systems architectures are defined and not changing," said Mark Jenks, vice president of 787-9 development, Boeing Commercial Airplanes. Boeing has completed the trade studies required to finalize the airplane's overall capability and basic design, allowing the airplane manufacturer and its suppliers to begin detailed design of parts, assemblies and other systems for the 787-9. As detailed designs are completed and released, production can begin. The first 787-9 delivery is scheduled for late 2013.

"We have a disciplined process in place to ensure we have completed all of the requirements for the development stage of the program," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "The team has done a fantastic job to get us through this important milestone."

The 787-9 is the second member of the 787 family. A slightly bigger version of the 787-8, the airplane will seat 250-290 passengers, 16 percent more than the 787-8. The 787-9 will have a range of 8,000 to 8,500 nautical miles. "We have been working closely with our customers for years to reach this milestone," said Mark Jenks, vice president of 787-9 development. "We are excited about the performance and capability this airplane will offer our customers."

Boeing says it remains on track for delivery of the first 787 to launch customer ANA in the fourth quarter of of this year.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (05.25.13)

Three-Eight Charlie If you know the name of the first woman to fly solo around the world, you’re ahead of most people. By the way, if you thought it was Amelia Earhart, you&r>[...]

ANN's Daily Aero-Term (05.25.13): Holding Pattern

Holding pattern. A racetrack pattern, involving two turns and two legs, used to keep an aircraft within a prescribed airspace with respect to a geographic fix.>[...]

Aero-News: Quote Of The Day (05.25.13)

“We need a world-class system of weather prediction in the United States – one, as the National Academy of Sciences recently put it, that is ‘second to none'." So>[...]

ANN FAQ: Share Aero-News With Your Friends

Send Them A Story -- We Don't Mind! Do you need another set of eyes to see that story you can't believe Jim just wrote? Want to spread Hognose's unique wisdom and perspective to th>[...]

Flight Attendant Union Endorses Ed Markey For U.S. Senate

Cites 'Strong Record On Aviation Security' The Association of Flight Attendants-CWA (AFA) has endorsed Congressman Ed Markey for the U.S. Senate, specifically noting his proven rec>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC