EA-18G Production Gets Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** AIRBORNE 05.21.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.21.13 **

** AIRBORNE 05.17.13 Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 05.17.13 **

** AIRBORNE 04.01.13 SPECIAL EDITION of Aero-TV-- CLICK HERE! ** HD iPad-Friendly Version -- AIRBORNE 04.01.13 SPECIAL EDITION **

Sat, Oct 30, 2004

EA-18G Production Gets Underway

First fuselage is Navy's next-generation electronic attack version of F-18

At a ceremony on October 22 in the Boeing Company’s St. Louis (MO) facility, Navy and industry leadership commemorated the start up of the production line for the forward fuselage for EA-1, the first EA-18G test aircraft being built under a system development and demonstration (SDD) contract.

The EA-18G is the Navy’s next-generation electronic attack aircraft and combines the combat-proven F/A-18 Super Hornet with a state-of-the-art Improved Capability III (ICAP III) electronic attack subsystem provided by Northrop Grumman Corporation. The EA-18G will serve as the Navy’s replacement for the EA-6B Prowler, providing a capability to detect, identify, locate and suppress hostile emitters.

EA-1 will be the first of two test aircraft produced under the SDD contract covering all laboratory, ground and flight-testing.

“Today marks a noteworthy day in naval aviation history as the first EA-18G officially commences on the Boeing production line,” said Naval Air Systems Command (NAVAIR) F/A-18 and EA-18G Program Manager Capt. B.D. Gaddis. “The joint Navy and industry team has done a remarkable job of managing an aggressive acquisition strategy that included achieving the best value for the government by anticipating change instead of reacting to it. The EA-18G, like the Super Hornet that precedes it, will be a great example of the Navy's ability to operate on a joint, networked battlefield.”

During the ceremony, Capt. Mark Darrah, EA-18 Integrated Program lead, signaled Boeing assembly line personnel to officially begin production. Attendees watched as the first aluminum bulkhead was hoisted up and installed into the forward fuselage of EA-1. The radar ring bulkhead is a critical component of the forward fuselage, providing support for the Advanced Electronically Scanned Array (AESA) radar and the nose cone of the aircraft. This is the first of many parts in the build cycle of the test aircraft, scheduled to fly in September 2006.

“Congratulations on the progress you made here today," said Program Executive Officer for Tactical Aircraft Programs Rear Adm. David Venlet. "All of your efforts are contributing to the defense of freedom.”

Built on the same assembly line as the F/A-18E/F Super Hornet, the EA-18G retains a high degree of commonality with the Super Hornet. Boeing will begin assembly of the second test program aircraft, EA-2, in the third quarter of 2005. Initial Operational Capability for the EA-18G is scheduled for 2009.

Fifty-six EA-18Gs are included in a multi-year contract that was signed with the Boeing Corporation in December 2003. The multi-year procurement covers years from 2005-2009.

FMI: www.news.navy.mil/local/navair

Advertisement

More News

Update: Startling... FAA Wants EAA To Pay Them To Staff Oshkosh

Could The FAA Get ANY Stranger? Worse Yet... Will They? ANN RealTime News Update, 1324ET, 05.23.13: Well... the statement we were promised YESTERDAY showed up today... and it doesn>[...]

Aspen Avionics Evolution Backup Display Expands To Piper Archer, Seminole

Aspen’s All Digital Backup Display Will Give Flight-Training Students The Total Glass Panel Experience Aspen Avionics announced Tuesday that Piper Aircraft has selected the E>[...]

Classic Aero-TV: EAA’s Jack Pelton – ‘Everything’s Going to Be OK’

Building A New Future For The EAA... One Issue At A Time Originally WebCast 11.14.12: With only a couple of weeks in pocket, directing the reorganization of the EAA in the wake of >[...]

House Committee Hearing Focuses On Strategic Stepping Stones To Mars

Subcommittee Chair Call Mars Mission A Congressional Priority The House Science Committee Subcommittee on Space held a hearing Tuesday to examine possible options for the next step>[...]

Dassault Falcon Embarks On Spares Pricing Overhaul

Third Such Restructuring In 10 Years Dassault Falcon has embarked on its third parts pricing overhaul in the past 10 years, assessing the cost of over 18,500 individual items. The >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2013 Web Development & Design by Pauli Systems, LC