AD: Gulfstream Aerospace LP Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Sep 22, 2021

AD: Gulfstream Aerospace LP Airplanes

AD 2021-17-14 Requires Non-Destructive Testing On The Forward (Front) Spar Vertical Stiffener

The FAA is adopting a new airworthiness directive (AD) for certain Gulfstream Aerospace LP Model Gulfstream G280 airplanes.

This AD was prompted by a report that during fullscale fatigue testing, a crack was found in the area of the attachment of the wing rib 0 to the front spar. This AD requires non-destructive testing on the forward (front) spar vertical stiffener and rib 0 for any cracking, installation of a doubler to the forward (front) spar and rib 0 attachment, and repair if necessary, as specified in a Civil Aviation Authority of Israel (CAAI) AD, which is incorporated by reference. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective October 14, 2021.

Supplementary Information: The CAAI, which is the aviation authority for Israel, has issued CAAI AD I-57-2020-06-01, dated January 27, 2021 (CAAI AD I-57-2020-06-01) (also referred to as the MCAI), to correct an unsafe condition for certain Gulfstream Aerospace LP Model Gulfstream G280 airplanes.

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain Gulfstream Aerospace LP Model Gulfstream G280 airplanes. The NPRM published in the Federal Register on June 10, 2021 (86 FR 30819). The NPRM was prompted by a report that during full-scale fatigue testing, a crack was found in the area of the attachment of the wing rib 0 to the front spar. The NPRM proposed to require non-destructive testing on the forward (front) spar vertical stiffener and rib 0 for any cracking, installation of a doubler to the forward (front) spar and rib 0 attachment, and repair if necessary, as specified in CAAI AD I-57-2020-06-01.

The FAA is issuing this AD to address any cracking at the area of the wing rib 0 to the front spar, which could affect the structural integrity of the wing. See the MCAI for additional background information.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC