Delays In CSeries First Flight May Drag Down Orders | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne/NBAA2014 10.24.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.24.14 **
** Airborne/NBAA2014 10.22.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.22.14 **
** Airborne/NBAA2014 10.21.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.21.14 **
** Airborne/NBAA2014 10.20.14 ** HD iPad-Friendly -- Airborne/NBAA2014 10.20.14 **

Fri, Nov 09, 2012

Delays In CSeries First Flight May Drag Down Orders

Bombardier Says First Plane Will Fly By The End Of June 2013

Bombardier had hoped that its new CSeries single-aisle airliner would fly before the end of 2012, but unspecified delays in the program have company officials now saying that the airplane likely won't leave the ground for the first time before June of next year ... and that could have airlines looking at existing competing products from Boeing and Airbus as they renew their fleets.

The news came as part of the company's report of third quarter results posted Wednesday. "The CSeries aircraft development program is making solid progress. The build for both the Complete Airframe Static Test (CAST) and the first flight test aircraft is progressing well," the report said. "Results from the on-the-ground integrated systems test and certification rig (CIASTA/Aircraft 0) are as expected. A number of key milestones have already been met, but at this point in the program the Aerospace group has encountered certain issues, mainly related to some suppliers. Therefore, first flight will now take place by the end of June 2013 and it is expected that entry-into-service (EIS) of the CS100 aircraft will occur approximately one year after first flight.

The timeline for the CS300 aircraft, which represents a significant portion of the program’s orders and commitments, remains unchanged with EIS scheduled for the end of 2014.

Cameron Doerksen, an analyst for National Bank Financial in Montreal, told Bloomberg News that the delay could spell a reluctance on the part of airlines to order CSeries airplanes until a more solid timeline is announced. "Bombardier's credibility will take a hit," he said, adding that investors will also remain "skeptical of the schedule until the plane actually flies."

Bombardier says it has 139 firm orders and 214 commitments for the CSeries airplane. CEO Pierre Beaudoin would not say whether the company was on track to have 300 firm orders on the books by the end of 2013.

(Pictured: Artist's rendering of CSeries aircraft)

FMI: www.bombardier.com

Advertisement

More News

Airborne 10.24.14: AML's Innovations, NASA Preps For Mars, LightHawk Saves

Also: AW609 Pilots Honored, Airbus' VIP Cabin, FreeFlight's FTX-200, Quicksilver S-LSA Milestone During our visit this week to NBAA 2014, Jim Campbell had a chance to talk with Mar>[...]

Airborne at NBAA-10.22.14: Legacy 500, Universal InSight, BendixKing AeroWave

Also: GE Honda, Sagem's Active SideStick, Syberjet Update, Techno Aerospace Knows How to Party The FAA handed over certification papers for Embraer's Legacy 500 executive jet durin>[...]

Airborne 10.24.14: AML's Innovations, NASA Preps For Mars, LightHawk Saves

Also: AW609 Pilots Honored, Airbus' VIP Cabin, FreeFlight's FTX-200, Quicksilver S-LSA Milestone During our visit this week to NBAA 2014, Jim Campbell had a chance to talk with Mar>[...]

AD: Pacific Aerospace Limited Airplanes

AD NUMBER: 2014-21-02 PRODUCT: Pacific Aerospace Limited Model FU24-954 and FU24A-954 airplanes.>[...]

ANN's Daily Aero-Linx (10.25.14)

The Canard Zone An online forum by and for owners and builders of canard aircraft.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC