Delays In CSeries First Flight May Drag Down Orders | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 09.15.14 ** HD iPad-Friendly -- Airborne 09.15.14 **
** Airborne 09.12.14 ** HD iPad-Friendly -- Airborne 09.12.14 **
** Airborne 09.10.14 ** HD iPad-Friendly -- Airborne 09.10.14 **

Fri, Nov 09, 2012

Delays In CSeries First Flight May Drag Down Orders

Bombardier Says First Plane Will Fly By The End Of June 2013

Bombardier had hoped that its new CSeries single-aisle airliner would fly before the end of 2012, but unspecified delays in the program have company officials now saying that the airplane likely won't leave the ground for the first time before June of next year ... and that could have airlines looking at existing competing products from Boeing and Airbus as they renew their fleets.

The news came as part of the company's report of third quarter results posted Wednesday. "The CSeries aircraft development program is making solid progress. The build for both the Complete Airframe Static Test (CAST) and the first flight test aircraft is progressing well," the report said. "Results from the on-the-ground integrated systems test and certification rig (CIASTA/Aircraft 0) are as expected. A number of key milestones have already been met, but at this point in the program the Aerospace group has encountered certain issues, mainly related to some suppliers. Therefore, first flight will now take place by the end of June 2013 and it is expected that entry-into-service (EIS) of the CS100 aircraft will occur approximately one year after first flight.

The timeline for the CS300 aircraft, which represents a significant portion of the program’s orders and commitments, remains unchanged with EIS scheduled for the end of 2014.

Cameron Doerksen, an analyst for National Bank Financial in Montreal, told Bloomberg News that the delay could spell a reluctance on the part of airlines to order CSeries airplanes until a more solid timeline is announced. "Bombardier's credibility will take a hit," he said, adding that investors will also remain "skeptical of the schedule until the plane actually flies."

Bombardier says it has 139 firm orders and 214 commitments for the CSeries airplane. CEO Pierre Beaudoin would not say whether the company was on track to have 300 firm orders on the books by the end of 2013.

(Pictured: Artist's rendering of CSeries aircraft)

FMI: www.bombardier.com

Advertisement

More News

AD: Bombardier, Inc. Airplanes

AD NUMBER: 2013-15-06 PRODUCT: Certain Bombardier, Inc. Model DHC-8-102, -103, -106, -201, -202, -301, -311, and –315 airplanes.>[...]

AD: Dassault Aviation Airplanes

AD NUMBER: 2013-26-05 PRODUCT: All Dassault Aviation Model FAN JET FALCON, FAN JET FALCON SERIES C, D, E, F, and G airplanes; Model MYSTERE-FALCON 200 airplanes; and Model MYSTERE->[...]

ANN's Daily Aero-Linx (09.17.14)

Learn to Fly Blog This blog features writings by aviation authors and flight instructors.>[...]

ANN's Daily Aero-Term (09.17.14): Base Turn

A turn executed by the aircraft during the initial approach between the end of the outbound track and the beginning of the intermediate or final approach track.>[...]

Aero-News: Quote Of The Day (09.17.14)

“In the near future, general aviation manufacturers will be able to certify their products more efficiently and effectively, meaning more safety in more airplanes.” Sou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC