Delays In CSeries First Flight May Drag Down Orders | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

Airborne Hi-Def On YouTube

Airborne 07.20.15

Airborne 07.21.15

Airborne 07.22.15

Airborne 07.23.15

Airborne 07.24.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Fri, Nov 09, 2012

Delays In CSeries First Flight May Drag Down Orders

Bombardier Says First Plane Will Fly By The End Of June 2013

Bombardier had hoped that its new CSeries single-aisle airliner would fly before the end of 2012, but unspecified delays in the program have company officials now saying that the airplane likely won't leave the ground for the first time before June of next year ... and that could have airlines looking at existing competing products from Boeing and Airbus as they renew their fleets.

The news came as part of the company's report of third quarter results posted Wednesday. "The CSeries aircraft development program is making solid progress. The build for both the Complete Airframe Static Test (CAST) and the first flight test aircraft is progressing well," the report said. "Results from the on-the-ground integrated systems test and certification rig (CIASTA/Aircraft 0) are as expected. A number of key milestones have already been met, but at this point in the program the Aerospace group has encountered certain issues, mainly related to some suppliers. Therefore, first flight will now take place by the end of June 2013 and it is expected that entry-into-service (EIS) of the CS100 aircraft will occur approximately one year after first flight.

The timeline for the CS300 aircraft, which represents a significant portion of the program’s orders and commitments, remains unchanged with EIS scheduled for the end of 2014.

Cameron Doerksen, an analyst for National Bank Financial in Montreal, told Bloomberg News that the delay could spell a reluctance on the part of airlines to order CSeries airplanes until a more solid timeline is announced. "Bombardier's credibility will take a hit," he said, adding that investors will also remain "skeptical of the schedule until the plane actually flies."

Bombardier says it has 139 firm orders and 214 commitments for the CSeries airplane. CEO Pierre Beaudoin would not say whether the company was on track to have 300 firm orders on the books by the end of 2013.

(Pictured: Artist's rendering of CSeries aircraft)

FMI: www.bombardier.com

Advertisement

More News

Airborne At OSH15 Day 5 Redux: Inhofe's Mission, NextGen GA Fund, New Kitfox

Also: Cicare 8, Switchblade Update, Beringer Alaskan Bush Gear, Jack Pelton Interview - Final E-I-C Note: Regularly Daily Airborne Unlimited Programming will resume this Monday now>[...]

Klyde Morris 07.31.15

Precision Targeting, Or Just Blind Luck? FMI: www.klydemorris.com>[...]

AD: Turbomeca S.A. Turboshaft Engines

AD NUMBER: 2015-13-04 PRODUCT: All Turbomeca S.A. Arriel 1A1, 1A2, 1B, 1C, 1C1, 1C2, 1D, 1D1, 1E2, 1K1, 1S, 1S1, 2B, 2B1, 2C, 2C1, 2C2, 2S1, and 2S2 turboshaft engines.>[...]

AD: The Boeing Company Airplanes

AD NUMBER: 2015-13-06 PRODUCT: Certain Boeing Model 747-400 and 747-400F series airplanes.>[...]

ANN's Daily Aero-Linx (07.31.15)

KRnet - Mailing List for KR Experimental Aircraft Builders and Pilots KRnet is a free Internet mailing list devoted to helping KR builders and pilots to construct and fly their KR >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC