Delays In CSeries First Flight May Drag Down Orders | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 08.31.15

Airborne 09.01.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.28.15

Airborne Hi-Def On YouTube

Airborne 08.31.15

Airborne 09.01.15

Airborne 08.26.15

Airborne 08.27.15

Airborne 08.28.15

EAA/ANN AirVenture Innovation Preview

AIP-#1 Vimeo

AIP-#2 Vimeo

AIP-Part 1 YouTube

AIP-Part 2 YouTube

Fri, Nov 09, 2012

Delays In CSeries First Flight May Drag Down Orders

Bombardier Says First Plane Will Fly By The End Of June 2013

Bombardier had hoped that its new CSeries single-aisle airliner would fly before the end of 2012, but unspecified delays in the program have company officials now saying that the airplane likely won't leave the ground for the first time before June of next year ... and that could have airlines looking at existing competing products from Boeing and Airbus as they renew their fleets.

The news came as part of the company's report of third quarter results posted Wednesday. "The CSeries aircraft development program is making solid progress. The build for both the Complete Airframe Static Test (CAST) and the first flight test aircraft is progressing well," the report said. "Results from the on-the-ground integrated systems test and certification rig (CIASTA/Aircraft 0) are as expected. A number of key milestones have already been met, but at this point in the program the Aerospace group has encountered certain issues, mainly related to some suppliers. Therefore, first flight will now take place by the end of June 2013 and it is expected that entry-into-service (EIS) of the CS100 aircraft will occur approximately one year after first flight.

The timeline for the CS300 aircraft, which represents a significant portion of the program’s orders and commitments, remains unchanged with EIS scheduled for the end of 2014.

Cameron Doerksen, an analyst for National Bank Financial in Montreal, told Bloomberg News that the delay could spell a reluctance on the part of airlines to order CSeries airplanes until a more solid timeline is announced. "Bombardier's credibility will take a hit," he said, adding that investors will also remain "skeptical of the schedule until the plane actually flies."

Bombardier says it has 139 firm orders and 214 commitments for the CSeries airplane. CEO Pierre Beaudoin would not say whether the company was on track to have 300 firm orders on the books by the end of 2013.

(Pictured: Artist's rendering of CSeries aircraft)

FMI: www.bombardier.com

Advertisement

More News

AeroSports Update: Rob Holland Wins The Gold

It Was A Big Day For The U.S. National Aerobatic Team As Rob Holland Takes The Gold In The Four Minute Free Program On August 29 It’s been reported on the International Aerob>[...]

ANN's Daily Aero-Linx (09.02.15)

FAA NAS Systems Engineering Portal (SEP) This site renames the NAS Enterprise Architecture Portal and acknowledges a more robust systems engineering and planning perspective along >[...]

ANN's Daily Aero-Term (09.02.15): Landing Gear Extend Speed

The maximum speed an aircraft can be safely flown while the landing gear is extended.>[...]

Aero-News: Quote Of The Day (09.02.15)

"Business Aviation’s global CO2 emissions are very small, being approximately 2 percent of all aviation and .04 percent of global man-made carbon emissions." Source: Excerpt >[...]

Passengers Brawl On JetBlue Flight

Razor, Pepper Spray Used In Conflict Between Two Women On Board Two women on board a JetBlue flight from Kingston, Jamaica to JFK airport in New York got into a brawl as the flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC