Urgent AD (CASA): Pilatus PC-12 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Aug 28, 2004

Urgent AD (CASA): Pilatus PC-12

Pilatus PC-12 Series Aeroplanes

AD/PC-12/43 Crew Seats Bucket Assembly Tubes 11/2004 DM

Applicability: All Model PC-12 and PC-12/45 aircraft, equipped with Israel Aircraft Industries Ltd. pilot seats, Pilatus part numbers 9593001111, 9593001121, 9593001131, and 9593001133, and co-pilot seats Pilatus part numbers 9593001112, 9593001122, 9593001132, and 9593001134; which have accumulated 6,000 hours or more time in service as at the effective date of this Directive.

Requirement: Perform a fluorescent dye-penetrant inspection to detect cracks at the grooved area of the left hand and right hand bucket assembly tubes of the pilot and co-pilot seats, in accordance with Pilatus PC-12 Service Bulletin No. 25-031, dated 21 July 2004, or later revision approved by FOCA. Report the inspection findings to Pilatus Aircraft Ltd. If during the inspection cracks are detected, before further flight, replace the affected bucket assembly. Contact Pilatus Aircraft Ltd. for a replacement repair procedure.

Note: Switzerland FOCA AD HB-2004-329 refers.

Compliance: Within 2 calendar weeks after 1 September 2004. This Airworthiness Directive becomes effective on 1 September 2004.

Background: A report was received of the failure of a crew seat’s bucket assembly tubes, which was detected during a maintenance inspection. Investigation revealed the tubes failed at the location of the energy device pins. The lower tubes remained attached, but the upper parts were completely disconnected. This could lead to reduced ability of the pilots to control the aircraft.

FMI: http://www.casa.gov.au/avreg/aircraft/ad/ADfiles/Under/PC-12/PC-12-043.pdf

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC