Ka-Chunk: Guardian Anti-Ballistic Cockpit Security Door Installed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 10.01.14 ** HD iPad-Friendly -- Airborne 10.01.14 **
** Airborne 09.29.14 ** HD iPad-Friendly -- Airborne 09.29.14 **
** Airborne 09.26.14 ** HD iPad-Friendly -- Airborne 09.26.14 **

Wed, Mar 05, 2003

Ka-Chunk: Guardian Anti-Ballistic Cockpit Security Door Installed

Final STC Test Conformation Demonstrated on Airbus A320

US Global Aerospace, Inc. has installed its Guardian™ Anti-Ballistic Cockpit Security Door on an Airbus A320 in Denver (CO), as part of the final phase of the U.S. Federal Aviation Administration’s Supplemental Type Certification process.

The complete installation was accomplished in under 8 hours -- less than one shift -- on an Airbus A320 owned by Ryan Air, and was validated by Future Jet Aerospace Inc., an independent aviation consulting firm (Dallas TX). The Guardian Door combines USGA’s kinetic energy absorbers, lightweight G-Lam™ anti-ballistic material and a proprietary passive vent system to provide access security and ballistic and decompression protection to the flight crew while eliminating the need for costly and time consuming airframe structural enhancements common on alternative cockpit security solutions.

"Other doors on the market can take over 200 labor hours and more than four days to install. Taking an aircraft out of service for such an extended period could potentially cost an aircraft operator millions of dollars in lost revenue.

"Our Guardian Door is not only secure and robust; we believe it also presents the most expedient and cost-effective cockpit fortification solution available," said John Robinson, CEO of USGA. “The light weight of our door (less than 50 pounds, compared to 85 to 120 pounds for others) results in additional fuel savings over the long term. In addition, the Guardian Door design has only 14 parts, which equates to lower potential component failure rates than competitive designs, some of which have in excess of 80 different parts.”

USGA has also made significant progress in developing commercial construction wall panels that integrate the anti-ballistic qualities of USGA’s proprietary G-Lam material with blast mitigation and fire suppression technologies. These lightweight panels are designed to be compatible with current construction techniques and easily retrofitted to existing facilities.

FMI: www.usglobalaero.com

Advertisement

More News

AeroSports Update: 38th World Military Parachuting Championship

Countries From Around The World Participated In The 38th World Military Parachuting Championship Competition In Indonesia The competition is part of a program administered through >[...]

ANN's Daily Aero-Linx (10.01.14)

NBAA/CAN Soiree One of the much-anticipated events of the NBAA conference, being held this year in Orlando.>[...]

ANN's Daily Aero-Term (10.01.14): Fixed Slot

A fixed, nozzle shaped opening near the leading edge of a wing that ducts air onto the top surface of the wing.>[...]

Aero-News: Quote Of The Day (10.01.14)

“SNC is offering access to crewed or uncrewed space missions." Source: John Roth, vice president of business development for SNC’s Space Systems.>[...]

ANN FAQ: Feel The Propwash!

Get Aero-News Delivered To Your E-Mail We know you, like many of our readers, make it a point to check out the latest news and information daily on Aero-News... but did you know th>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC