Ka-Chunk: Guardian Anti-Ballistic Cockpit Security Door Installed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 08.25.14 ** HD iPad-Friendly -- Airborne 08.25.14 **
** Airborne 08.22.14 ** HD iPad-Friendly -- Airborne 08.22.14 **
** Airborne 08.20.14 ** HD iPad-Friendly -- Airborne 08.20.14 **

Wed, Mar 05, 2003

Ka-Chunk: Guardian Anti-Ballistic Cockpit Security Door Installed

Final STC Test Conformation Demonstrated on Airbus A320

US Global Aerospace, Inc. has installed its Guardian™ Anti-Ballistic Cockpit Security Door on an Airbus A320 in Denver (CO), as part of the final phase of the U.S. Federal Aviation Administration’s Supplemental Type Certification process.

The complete installation was accomplished in under 8 hours -- less than one shift -- on an Airbus A320 owned by Ryan Air, and was validated by Future Jet Aerospace Inc., an independent aviation consulting firm (Dallas TX). The Guardian Door combines USGA’s kinetic energy absorbers, lightweight G-Lam™ anti-ballistic material and a proprietary passive vent system to provide access security and ballistic and decompression protection to the flight crew while eliminating the need for costly and time consuming airframe structural enhancements common on alternative cockpit security solutions.

"Other doors on the market can take over 200 labor hours and more than four days to install. Taking an aircraft out of service for such an extended period could potentially cost an aircraft operator millions of dollars in lost revenue.

"Our Guardian Door is not only secure and robust; we believe it also presents the most expedient and cost-effective cockpit fortification solution available," said John Robinson, CEO of USGA. “The light weight of our door (less than 50 pounds, compared to 85 to 120 pounds for others) results in additional fuel savings over the long term. In addition, the Guardian Door design has only 14 parts, which equates to lower potential component failure rates than competitive designs, some of which have in excess of 80 different parts.”

USGA has also made significant progress in developing commercial construction wall panels that integrate the anti-ballistic qualities of USGA’s proprietary G-Lam material with blast mitigation and fire suppression technologies. These lightweight panels are designed to be compatible with current construction techniques and easily retrofitted to existing facilities.

FMI: www.usglobalaero.com

Advertisement

More News

Airborne 08.25.14: SpaceX Setback, AMA Fights FAA, Redbird Migration 2014

Also: Copperstate Fly-In, No-Fly List Changes, Volcano Alert, Inhofe Campaigns In RV-8 In an initial report, ANN space correspondent, Wes Oleszewski, said that on the evening of Au>[...]

Aero-TV: In The Nick Of Time? - A NextGen GA Fund Update

The GA World Needs All The Help It Can Get... IF It Can Get It A hot topic at EAA AirVenture 2014 was the subject of the FAA requirement to be ADS-B equipped by January 1, 2020. In>[...]

ANN's Daily Aero-Linx (08.27.14)

International Republic Seabee Owner's Club (IRSOC) A website dedicated to the Seabee seaplane. You can find information about the airplanes and events, and talk to other Seabee ent>[...]

ANN's Daily Aero-Term (08.27.14): GPS Approach Overlay Program

An authorization for pilots to use GPS avionics under IFR for flying designated existing nonprecision instrument approach procedures, with the exception of LOC, LDA, and SDF proced>[...]

Aero-News: Quote Of The Day (08.27.14)

“We are grateful to Bruce for his years of unparalleled dedication to general aviation, and are delighted that he has agreed to continue on as our senior safety advisor.&rdqu>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC