Boeing To Propose Battery Fix To FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 07.25.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.25.14 **
** Airborne 07.23.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.23.14 **
** Airborne 07.21.14--CLICK HERE! ** HD iPad-Friendly Version--Airborne 07.21.14 **

Fri, Feb 22, 2013

Boeing To Propose Battery Fix To FAA

Dreamliners Could Be Flying Again In Two Months, Sources Say

Boeing has an appointment with FAA Administrator Michael Huerta Friday to discuss a possible fix for the battery issues that have kept its Dreamliner airplanes grounded for more than a month. Sources close to the company say that if they are approved, the fleet could be carrying passengers again in two months.

The Associated Press reports that the planemaker believes that adding ceramic insulation between the battery cells and other changes, including a modified venting system, would prevent the batteries from overheating and causing a fire. It is not expected that Huerta will immediately give approval to the re-design, but at least it would be a starting point for a discussion of what standards Boeing will need to meet as it designs and tests the repair before installing it on the affected planes.

But the fix does not get to the root cause of why the batteries overheated in the first place, which has not yet been determined. Boeing's hope is that by proposing a safer design they can get the airplanes back in the air, and start to make inroads on a delivery backlog that is eating away at its cash reserves.

The proposed repairs would also include increasing the spacing between the battery cells, and modifications in the way they are installed in the airplane to reduce the effects of moisture, vibration, or swelling of the cells. It would also include a system to vent any hazardous material to the outside of the airplane, and monitor individual cells rather than the system as a whole.

Boeing thinks it could rebuild the battery systems on planes already in service by the end of March, but there is no guarantee that the FAA will approve the changes that quickly.

(Dreamliner image from file)

FMI: www.faa.gov, www.boeing.com

Advertisement

More News

Trig Avionics Announces New ADS-B Out Solution

TN70 WAAS GPS Receiver Optimized For Use With Other Trig Avionics Trig Avionics is introducing its new TN70 WAAS GPS with companion Antenna, optimized for use with Trig products.>[...]

ANN's Daily Aero-Linx (07.25.14)

Aviation Digital Data Service The Aviation Digital Data Service (ADDS) makes available to the aviation community text, digital and graphical forecasts, analyses, and observations o>[...]

ANN's Daily Aero-Term (07.25.14): Pitch Point

A fix/waypoint that serves as a transition point from a departure procedure or the low altitude ground-based navigation structure into the high altitude waypoint system.>[...]

Aero-News: Quote Of The Day (07.25.14)

"The final rule is now planned for, I think its December of 2017. That is later than the statute, which calls for a final rule by the end of 2015." Source: FAA's Associate Administ>[...]

ANN FAQ: Disqus

A Powerful New Tool For You To Use For Your Aero-Conversations Want to start a conversation about a story you've seen on Aero-News? It's even easier with Disqus, a powerful, web-ba>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC