Boeing To Propose Battery Fix To FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 08.29.14 ** HD iPad-Friendly -- Airborne 08.29.14 **
** Airborne 08.27.14 ** HD iPad-Friendly -- Airborne 08.27.14 **
** Airborne 08.25.14 ** HD iPad-Friendly -- Airborne 08.25.14 **

Fri, Feb 22, 2013

Boeing To Propose Battery Fix To FAA

Dreamliners Could Be Flying Again In Two Months, Sources Say

Boeing has an appointment with FAA Administrator Michael Huerta Friday to discuss a possible fix for the battery issues that have kept its Dreamliner airplanes grounded for more than a month. Sources close to the company say that if they are approved, the fleet could be carrying passengers again in two months.

The Associated Press reports that the planemaker believes that adding ceramic insulation between the battery cells and other changes, including a modified venting system, would prevent the batteries from overheating and causing a fire. It is not expected that Huerta will immediately give approval to the re-design, but at least it would be a starting point for a discussion of what standards Boeing will need to meet as it designs and tests the repair before installing it on the affected planes.

But the fix does not get to the root cause of why the batteries overheated in the first place, which has not yet been determined. Boeing's hope is that by proposing a safer design they can get the airplanes back in the air, and start to make inroads on a delivery backlog that is eating away at its cash reserves.

The proposed repairs would also include increasing the spacing between the battery cells, and modifications in the way they are installed in the airplane to reduce the effects of moisture, vibration, or swelling of the cells. It would also include a system to vent any hazardous material to the outside of the airplane, and monitor individual cells rather than the system as a whole.

Boeing thinks it could rebuild the battery systems on planes already in service by the end of March, but there is no guarantee that the FAA will approve the changes that quickly.

(Dreamliner image from file)

FMI: www.faa.gov, www.boeing.com

Advertisement

More News

Classic Aero-TV: 26,000 Pounds of Heli-Beast -- The Cold War Air Museum’s Mi-24

Ugly To Many, But Incredibly Beautiful To Hard-Core Helo Fans ANN CEO and Editor-in-Chief, Jim Campbell visited the Cold War Air Museum's Mi-24 Russian helicopter at HAI a little o>[...]

Airborne 08.29.14: Google Drone!, Cessna's 10,000th, Bearhawk LODA

Also: Big Boeing Order, Napa Tower Quaked, Landsberg Retires, Galileo Falters Breaking News! Google has unveiled an exciting new UAV project, called Project Wing, which has been un>[...]

Aero-News: Quote Of The Day (09.01.14)

“We are delighted that construction of a world-class aerospace assembly facility is underway in Lafayette and that skilled Louisiana workers will be producing the standard-be>[...]

Annual Oshkosh 2014 'Best/Worst Of' Award Selection Invites YOUR Participation!

YOU Can Contribute To The Annual List Compiled By The Staff and Readership of the ANN and Aero-TV! E-I-C Note: We're going to start naming names and dropping details THIS week--- t>[...]

Klyde Morris (09.01.14)

Klyde Drones On... and On... FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC