Boeing To Propose Battery Fix To FAA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

** Airborne 12.17.14 ** HD iPad-Friendly -- Airborne 12.17.14 **
** Airborne 12.15.14 ** HD iPad-Friendly -- Airborne 12.15.14 **
** Airborne 12.12.14 ** HD iPad-Friendly -- Airborne 12.12.14 **

Fri, Feb 22, 2013

Boeing To Propose Battery Fix To FAA

Dreamliners Could Be Flying Again In Two Months, Sources Say

Boeing has an appointment with FAA Administrator Michael Huerta Friday to discuss a possible fix for the battery issues that have kept its Dreamliner airplanes grounded for more than a month. Sources close to the company say that if they are approved, the fleet could be carrying passengers again in two months.

The Associated Press reports that the planemaker believes that adding ceramic insulation between the battery cells and other changes, including a modified venting system, would prevent the batteries from overheating and causing a fire. It is not expected that Huerta will immediately give approval to the re-design, but at least it would be a starting point for a discussion of what standards Boeing will need to meet as it designs and tests the repair before installing it on the affected planes.

But the fix does not get to the root cause of why the batteries overheated in the first place, which has not yet been determined. Boeing's hope is that by proposing a safer design they can get the airplanes back in the air, and start to make inroads on a delivery backlog that is eating away at its cash reserves.

The proposed repairs would also include increasing the spacing between the battery cells, and modifications in the way they are installed in the airplane to reduce the effects of moisture, vibration, or swelling of the cells. It would also include a system to vent any hazardous material to the outside of the airplane, and monitor individual cells rather than the system as a whole.

Boeing thinks it could rebuild the battery systems on planes already in service by the end of March, but there is no guarantee that the FAA will approve the changes that quickly.

(Dreamliner image from file)

FMI: www.faa.gov, www.boeing.com

Advertisement

More News

Dassault Aviation Reveals First Falcon 8X

Next Step: Maiden Flight In First Quarter 2015 Dassault Aviation on Wednesday rolled back the curtains on the ultra long range Falcon 8X, the company's new flagship and the latest >[...]

Evergreen Museum Says Its 'Business As Usual'

Some Of Its Aircraft Are On Loan From Company Reorganizing Under Bankruptcy Laws The Evergreen Aviation and Space Museum in McMinnville, OR says that it is doing just fine, thank y>[...]

Airborne 12.15.14: A380 Future, More USA Today Disappointments, Jetman FORMATION

Also: Comet Water Differences, Garmin Datalink, Bogert Battery Boxes, WSI/iOs, Mistletoe Copter Fail Airbus hasn't seen a single airline order for its double-decker A380 superjumbo>[...]

NTSB Prelim Released From Gaithersburg, MD Phenom Accident

Six Fatally Injured When Plane Impacted A Home The NTSB had released its preliminary report from an accident which occurred December 8, 2014 involving an Embraer EMB-500 Phenom 100>[...]

Airborne 12.17.14: Evergreen Woes, Foolish Pilot Tricks, No 757 Replacement--Yet

Also: $1M Aero-Photo, Draken Gets A-4s, 'Super Dell' Acts Super Dumb, Legendary Bell 47, Osprey Hours Evergreen Vintage Aircraft, LLC, the company that owns many of the aircraft on>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2014 Web Development & Design by Pauli Systems, LC