Gulfstream G650 Logs Some Hours, Passes Initial Flight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Sat, Dec 05, 2009

Gulfstream G650 Logs Some Hours, Passes Initial Flight Tests

Gulfstream: 'Performs Flawlessly' During Nearly Two-Hour Flight

Gulfstream is providing new details about the G650's successful completion of its first series of flight tests. During a 1-hour and 45-minute flight, G650 project pilot Jake Howard and senior experimental test pilot Tom Horne, along with flight engineer Bill Osborne, tested the aircraft’s handling qualities, engine operability and flap operation.

Additionally, the crew evaluated the aircraft’s pitot-static systems, avionics, hydraulic systems, electrical power generation and distribution, flight controls, and cabin environmental and pressurization controls.

The evaluations were performed at intended airspeeds of up to 240 knots and desired altitudes of up to 9,500 feet. Throughout the flight, personnel from Gulfstream flight test, engineering and flight operations monitored key, real-time data using a new telemetry system configured to downlink more than 2,000 different parameters.

“The pilots’ reports indicate that the G650’s flying qualities were outstanding,” said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. “With its cutting-edge technology, the aircraft performed superbly, as we expected it would. We are very excited to continue our flight-test program and look forward to certification in 2011.”

The G650 flight-test and certification plan involves five aircraft and more than 1,800 hours of testing. Gulfstream is working toward concurrent certification from the Federal Aviation Administration and the European Aviation Safety Agency in 2011.

Gulfstream announced the G650 program on March 13, 2008. On Sept. 29, 2009, the aircraft rolled out under its own power in front of a crowd of more than 7,000 people. It completed its first flight on Nov. 25, 2009, and remains on schedule for entry-into-service in 2012. The G650 is powered by Rolls-Royce BR725 engines, is capable of traveling 7,000 nautical miles at 0.85 Mach and has a maximum operating speed of 0.925 Mach.

FMI: www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC