Gates Announces Joint Strike Fighter Program Shakeup | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Feb 03, 2010

Gates Announces Joint Strike Fighter Program Shakeup

$614 Million Withheld From Lockheed Martin

Defense Secretary Robert M. Gates announced a restructuring in the F-35 Joint Strike Fighter office Monday to provide increased oversight of a program he conceded has fallen behind in meeting key benchmarks.

File Photo

Gates also announced that he has withheld $614 million in performance fees from the lead contractor, Lockheed-Martin, "since the taxpayers should not have to bear the entire burden of getting the JSF program on track."

"We have restructured the F-35 program and believe it is on track to become the backbone of U.S. air superiority for the next generation," Gates said during a Pentagon news conference. "Nonetheless, the progress and performance of F-35, over the last two years, has not been what it should, as a number of key goals and benchmarks were not met."

To fix the situation, the secretary announced a change in leadership at the Joint Strike Fighter program office, which had been headed by Marine Maj. Gen. David R. Heinz. A three-star officer yet to be named will replace him, Gates said, the higher rank reflecting the importance of the program to the future of military aviation.

Gates, who visited Lockheed Martin's F-35 production facility in Fort Worth, Texas, Aug. 31, said he has become concerned about the program's progress as Ashton Carter, undersecretary for acquisition, technology and logistics, became more involved in the program. "It was clear that there were more problems than we were aware of when I visited Fort Worth," Gates said. "And I think that the restructuring program that Dr. Carter has put in place will work. It is realistic. The cost estimates are now in accord with what the joint estimating teams are predicting, rather than what the program is predicting."

The problems facing the program aren't insurmountable, with proper steps taken, Gates said. "I believe that we are in a position to now move forward with this program in a realistic way," he said. "But by the same token, one cannot absorb the additional costs that we have in this program and the delays without people being held accountable."

Gates pointed to his track record since coming to the Defense Department of demanding accountability. "Accountability is not just about holding contractors responsible. The Department of Defense also bears responsibility for the JSF's troubling performance record," he said. "I think if I've set one tone here at the Department of Defense, it is that when things go wrong, people will be held accountable."

Visiting the Lockheed-Martin plant this summer, Gates said the importance of the F-35 program can't be overstated, citing the new aircraft as an example of new, innovative and more cost-effective ways to meet the country's current and future defense needs.

The F-35 is the first aircraft to be developed within the department to meet the needs of three services, with three variants being developed simultaneously. This brings cost savings and economies of scale not possible with separate aircraft because the F-35s will share common components and maintenance requirements, Gates noted. "We cannot afford, as a nation, not to have this airplane," he said, noting that every dollar saved in acquisition frees up a dollar to support other critical wartime requirements.

The Air Force will receive the F-35's "A" variant, which will provide conventional takeoff and landing capabilities. The Marine Corps is slated to receive the "B" variant that has a vertical-lift capability. The Navy will receive the "C" variant, designed for carrier launches.

The different F-35 variants will replace the legacy F-16 aircraft for the Air Force and the F/A-18 and AV-8 aircraft for the Navy and Marine Corps.

FMI: www.dod.mil

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC