Airbus Military Completes A400M Full Scale Fatigue Tests For EASA Certification | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Mar 08, 2011

Airbus Military Completes A400M Full Scale Fatigue Tests For EASA Certification

The Test Airframe Has Successfully Completed The Number Of Required Simulated Flight-Cycles

Airbus Military has successfully completed the number of required simulated flight-cycles on a full scale test airframe to achieve civil type certification of the A400M by the European Aviation Safety Agency (EASA).

1,665 simulated flights are required for European Aviation Safety Agency (EASA) type certification of the A400M. Airubs planned a total of 25,000 simulated flights over an 18 month period - equating to 2.5 times the A400M's design-life. Static testing of another A400M test airframe, MSN5000 was completed in Madrid in September 2010. That airframe continues to be used for further fatigue tests of composite structures which will last until early 2012.

The test program is required to simulate flights at least one year ahead of the actual operations performed by the aircraft. The test specimen at Dresden, known as MSN5001, has now undergone the required number of cycles, which equates to about five times the maximum number of flights expected to be recorded annually by each A400M in service, in order to give a large safety margin.

The German government recently reached an agreement with Airbus to buy 53 of the A400M airlifters, and plans to sell 13 to outside parties. That agreement reportedly removed the final hurdle to completing the long-overdue and over-budget transport aircraft. A consortium of European governments which had been working to rescue the project agreed to a price increase that will push the overall cost of the aircraft to the various governments to nearly $2.7 billion.

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC