Urgent CASA AD: A330/51 Escape Slides & Slide Rafts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Tue, Jun 14, 2005

Urgent CASA AD: A330/51 Escape Slides & Slide Rafts

AD/A330/51 Escape Slides & Slide Rafts - Electrical Harness Routing 8/2005DM

Applicability: A330-200 and A330-300 series aeroplanes where crew/passenger doors 1 and 4 and crew/passenger door 3 (type 1 only), RH and LH sides of the fuselage, are equipped with emergency escape slides or slide rafts Part Numbers (P/N) 7A1508-XXX or 7A1509-XXX.

Requirement: 1. Inspect the electrical harness routing of emergency escape slides/slide rafts P/N 7A1508-XXX or 7A1509-XXX in accordance with the instructions of Airbus All Operators Telex (AOT) A330-25A3272 R1 dated 24 March 2005 or later revision approved by the DGAC.

Inspections accomplished prior to the effective date of this Directive, in accordance with AOT A330-25A3272 R1, are considered acceptable for compliance with this Requirement.

2. If, during the Requirement 1 inspection, any harness is found to be incorrectly installed or routed, correct the installation in accordance with AOT A330-25A3272 R1 or later revision approved by the DGAC.

Note: DGAC AD F-2005-077 (EASA approval 2005-3956) refers.

Compliance: For Requirement 1- Within 1 700 hours time in service and thereafter on each removal/installation of the escape slide. For Requirement 2 - Before further flight, immediately following the Requirement 1 inspection.

This Airworthiness Directive becomes effective on 16 June 2005.

Background: The French Direction Générale de l’Aviation Civile (DGAC) has advised that during an aircraft scheduled check, an operator experienced an unsuccessful slide raft deployment test on LH crew/passenger door No. 1. Investigations revealed that the electrical harness had been incorrectly installed during the previous slide raft removal/installation therefore preventing the deployment of the slide raft during the test. This situation, if not corrected, could delay the evacuation of the persons onboard in an emergency.

This Directive requires an initial inspection to ensure correct installation of the electrical harness followed by repetitive inspections each time a slide is removed/installed.

FMI: http://casa.gov.au/airworth/airwd/NEW/urgent.htm

Advertisement

More News

ANN's Daily Aero-Linx (04.15.24)

Aero Linx: International Flying Farmers IFF is a not-for-profit organization started in 1944 by farmers who were also private pilots. We have members all across the United States a>[...]

Classic Aero-TV: 'No Other Options' -- The Israeli Air Force's Danny Shapira

From 2017 (YouTube Version): Remembrances Of An Israeli Air Force Test Pilot Early in 2016, ANN contributor Maxine Scheer traveled to Israel, where she had the opportunity to sit d>[...]

Aero-News: Quote of the Day (04.15.24)

"We renegotiated what our debt restructuring is on a lot of our debts, mostly with the family. Those debts are going to be converted into equity..." Source: Excerpts from a short v>[...]

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.16.24): Chart Supplement US

Chart Supplement US A flight information publication designed for use with appropriate IFR or VFR charts which contains data on all airports, seaplane bases, and heliports open to >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC