Arianespace's No. 2 Soyuz Begins Taking Shape For Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Nov 02, 2011

Arianespace's No. 2 Soyuz Begins Taking Shape For Launch

Liftoff Planned For December 16

Preparations for Arianespace's second Soyuz mission from French Guiana are moving forward as assembly and checkout of the vehicle continue at the Spaceport.

Its basic three-stage launcher is now taking shape in the MIK integration hall at the Soyuz launch site, located in the Spaceport's northwestern sector near the town of Sinnamary. This process began with the horizontal mating of the second-stage central core's upper and lower sections, using jigs aligned in the MIK facility's floor-level rail system.

The activity cleared the way for installation of the launcher's four first-stage boosters, of which the first two were mated to its core center stage during the weekend. Its remaining two boosters will be added in the next step, to be followed by integration of the in-line third stage - completing the vehicle's build-up in the horizontal integration process used for all Soyuz launchers. Also in the MIK facility, the Soyuz' Fregat upper stage continues to undergo its checkout, which includes validation of data communications.

Once the Fregat's preparations are complete, this stage will be moved to the Spaceport's S3B clean room, where it will be integrated with the mission's payload and fairing - creating the launcher's upper composite section. The upper composite is to be installed atop the Soyuz once the vehicle is rolled out to the launch pad and erected in the vertical position, protected by a purpose-built mobile service gantry.

For this no. 2 flight of Soyuz from French Guiana - which is set for December 16 - the medium-lift launcher will carry a multi-passenger payload composed of the French CNES space agency's Pleiades optical Earth observation satellite, accompanied by four French Elisa micro-satellite demonstrators for defense-related electronic intelligence gathering (ELINT), and the Chilean SSOT (Sistema satelital de Observacion de la Tierra) optical satellite for civilian and defense Earth observation.

Arianespace introduced Soyuz at the Spaceport with a highly successful inaugural flight on October 21, which placed two Galileo navigation satellites into circular medium-Earth orbit. (Photo Courtesy Arianespace)

FMI: www.arianspace.com

Advertisement

More News

Airborne 04.16.24: RV Update, Affordable Flying Expo, Diamond Lil

Also: B-29 Superfortress Reunion, FAA Wants Controllers, Spirit Airlines Pulls Back, Gogo Galileo Van's Aircraft posted a short video recapping the goings-on around their reorganiz>[...]

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC