First 2010 Launch Of An Ariane 5 Is 50th For The Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.09.24

Airborne-Unlimited-04.10.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Mar 25, 2010

First 2010 Launch Of An Ariane 5 Is 50th For The Program

Will Carry A Dual Payload Of Civilian And Military Satellites

Arianespace has set March 26 as the launch date for its initial Ariane 5 mission of 2010, Ariane Flight V194. The launch will carry SES ASTRA's ASTRA 3B commercial telecommunications satellite and the COMSATBw-2 secure relay platform for the German armed forces.

The Friday evening liftoff is scheduled at the opening of a launch window that runs from 1903 local time at the Spaceport in French Guiana to 1952 (22h03-22h52 UTC).

This mission will be the 194th flight of an Ariane family launch vehicle, and the 50th for an Ariane 5. The heavy-lift Ariane 5 ECA version will be carrying a total payload of approximately 20,000 pounds, which includes 17,500 pounds for the ASTRA 3B and COMSATBw-2 satellites, plus the associated integration hardware and the SYLDA dual-payload dispenser system.

ASTRA 3B is a state-of-the-art Ku- and Ka-band spacecraft designed for direct-to-home broadcast services and two-way broadband relay across Europe and the Middle East. Produced by EADS Astrium, it will be positioned at SES ASTRA's important 23.5 deg. East orbital position.

COMSATBw-2 will deliver key services for the German Bundeswehr (German armed forces). Based on the Spacebus 3000B2 satellite bus, the platform was designed, integrated and tested by Thales Alenia Space on behalf of EADS Astrium - the program's space segment prime contractor.

This year-opening flight had been postponed from March 24 to allow for certain additional verifications on the launch vehicle. The delay is in line with Arianespace's policy of ensuring the total readiness of its launchers as part of the company's commitment to quality and reliability.

FMI: www.arianespace.com

Advertisement

More News

ANN's Daily Aero-Linx (04.13.24)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (04.13.24): Beyond Visual Line Of Sight (BVLOS)

Beyond Visual Line Of Sight (BVLOS) The operation of a UAS beyond the visual capability of the flight crew members (i.e., remote pilot in command [RPIC], the person manipulating th>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC