First A350 XWB With Wings Complete Emerges For Outdoor Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Feb 28, 2013

First A350 XWB With Wings Complete Emerges For Outdoor Testing

Other Airframes Continue In Development

The first A350 XWB – MSN001 – now showing its completed wings, has moved to its next phase of ground testing, from Roger Béteille A350 XWB FAL “Station 30” to the Clément Ader area “Station 18” in Toulouse. The aircraft is structurally complete and shows the installed winglets, belly fairing panels, main landing gear doors.

The aircraft has recently completed successfully a series of indoor ground tests as well as stability tests on ‘movable’ elements such as rudder, elevators, ailerons and wing spoilers and landing gears extraction/retraction. The next steps which will take place outdoors at the Station 18 ground test station will include three planned families of tests: Fuel tanks testing – including levels, flows, sealing and internal fuel transfer functions; pressure testing of the fuselage; and radio equipment testing.

A third aircraft, designated MSN3, recently entered final assembly. That aircraft will be deployed for a variety of A350 XWB testing – including performance at high and medium altitudes, in cold weather and hot temperatures and on long-range flights.

Airbus also said recently that it will revert back to the "proven and mastered" nickel cadmium main batteries for its A350 XWB program at Entry into Service (EIS). Airbus considers this to be the most appropriate way forward in the interest of program execution and A350 XWB reliability.

(Image provided by Airbus)

FMI: www.airbus.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC