Qatar Airways Grounds One Of Its Three Dreamliners | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Dec 17, 2012

Qatar Airways Grounds One Of Its Three Dreamliners

Airplane Developed An Electrical Problem Similar To One That Cropped Up On A UCH 787

Qatar Airways says it has been forced to ground one of its three Dreamliners because of an electrical problem that forced them to take the jet out of service. A similar problem was discovered recently in a 787 belonging to United Continental Holdings.

Qatar Airways CEO Akbar Al Baker was not pleased. He said in an interview at Heathrow in London Thursday that the airline would "demand compensation from Boeing," according to a report from Reuters.

The airplane was grounded December 9th. Al Baker said that the airplane would not fly until Boeing had repaired the aircraft, which the company said it was working to get done. But the planemaker said it was not certain that the issue was with a power generator, as was the case with a Dreamliner belonging to United Continental which was forced to make an emergency landing December 4 when one of the three units on board failed.

Boeing said it would "evaluate the findings in Qatar" to get to the root cause of the problem before determining what the next steps should be.

Al Baker said that he was concerned that having similar problems occur on such new airplanes could be a symptom of wider problems with the jet. He blamed the Dreamliner's delays for slowing the airline's expansion plans.

Qatar Airways has 60 Dreamliners on order, with the next deliveries scheduled for December 19th.

(Image from file)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Linx (04.16.24)

Aero Linx: International Business Aviation Council Ltd IBAC promotes the growth of business aviation, benefiting all sectors of the industry and all regions of the world. As a non->[...]

Aero-News: Quote of the Day (04.16.24)

"During the annual inspection of the B-24 “Diamond Lil” this off-season, we made the determination that 'Lil' needs some new feathers. Due to weathering, the cloth-cove>[...]

Airborne 04.10.24: SnF24!, A50 Heritage Reveal, HeliCycle!, Montaer MC-01

Also: Bushcat Woes, Hummingbird 300 SL 4-Seat Heli Kit, Carbon Cub UL The newest Junkers is a faithful recreation that mates a 7-cylinder Verner radial engine to the airframe offer>[...]

Airborne 04.12.24: SnF24!, G100UL Is Here, Holy Micro, Plane Tags

Also: Seaplane Pilots Association, Rotax 916’s First Year, Gene Conrad After a decade and a half of struggling with the FAA and other aero-politics, G100UL is in production a>[...]

Airborne-Flight Training 04.17.24: Feds Need Controllers, Spirit Delay, Redbird

Also: Martha King Scholarship, Montaer Grows, Textron Updates Pistons, FlySto The FAA is hiring thousands of air traffic controllers, but the window to apply will only be open for >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC