First Legacy 500 Empennage Shipped From Portugal | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.01.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-Unlimited-04.11.24

Airborne-Unlimited-04.12.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Nov 28, 2012

First Legacy 500 Empennage Shipped From Portugal

Composite Components Heading To Embraer HQ In Brazil

The first shipset in composite material in its Embraer Compósitos factory in Évora, Portugal have been completed and shipped. This first part, a Legacy 500 empennage, is on its way to Embraer headquarters in São José dos Campos, Brazil.

"As serial production of the new Legacy 500 aircraft approaches, the completion and shipment of this first empennage from Portugal to Brazil represents a major and important milestone for Embraer and a great achievement by the whole Embraer Compósitos team,” said Paulo Marchioto, President of Embraer Portugal and Board member at Embraer Compósitos. “With close support from Brazil, the team at Embraer Compósitos has demonstrated great skill allowing us, in a very short time since inauguration, to deliver such a sophisticated part.”

In full compliance with the requirements set by Embraer headquarters, the empennage is made mainly of carbon fibre parts. It was assembled in a semi-automatic line in one of two Embraer plants in Évora, allowing for higher efficiency in operations like drilling and riveting of primary structures made in composite.
 
“This first delivery from Évora is a landmark in Embraer’s globalization strategy and our activities in Europe, reflecting our commitment to call on local expertise to support us in the development and manufacturing of our products,” added Hélio Bambini, Vice President, Embraer Industrial Operations.

(Image provided by Embraer)

FMI: www.embarer.com

Advertisement

More News

ANN's Daily Aero-Term (04.14.24): Maximum Authorized Altitude

Maximum Authorized Altitude A published altitude representing the maximum usable altitude or flight level for an airspace structure or route segment. It is the highest altitude on >[...]

ANN's Daily Aero-Linx (04.14.24)

Aero Linx: Soaring Safety Foundation (SSF) The Soaring Safety Foundation (SSF) is the Training and Safety arm of the Soaring Society of America (SSA). Our mission is to provide ins>[...]

Classic Aero-TV: 'We're Surviving'-- Kyle Franklin Describes Airshow Life 2013

From 2013 (YouTube Version): Dracula Lives On Through Kyle Franklin... and We're NOT Scared! ANN CEO and Editor-in-Chief, Jim Campbell speaks with Aerobatic and airshow master, Kyl>[...]

Aero-News: Quote of the Day (04.14.24)

“For Montaer Aircraft it is a very prudent move to incorporate such reliable institution as Ocala Aviation, with the background of decades in training experience and aviation>[...]

Airborne 04.09.24: SnF24!, Piper-DeltaHawk!, Fisher Update, Junkers

Also: ForeFlight Upgrades, Cicare USA, Vittorazi Engines, EarthX We have a number of late-breaking news highlights from the 2024 Innovation Preview... which was PACKED with real ne>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC