Boeing Celebrates Groundbreaking For 777X Composite Wing Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Oct 24, 2014

Boeing Celebrates Groundbreaking For 777X Composite Wing Center

Investment Of More Than $1 Billion Will Sustain Thousands Of Jobs In The Puget Sound Region

Boeing this week celebrated the groundbreaking of its new 777X Composite Wing Center at the Everett, WA campus.  Permitting for the new 1-million-square-foot facility was completed approximately seven weeks earlier than anticipated, allowing for an accelerated start to construction.

Boeing is investing more than $1 billion in the Everett site for construction and outfitting of the new building.

Once completed, the facility located on the north side of the main final assembly building will help usher in composite wing fabrication for the company's newest commercial jetliner and sustain thousands of local jobs for decades to come.

"We're excited with the progress being made on this new facility that will play a crucial role in bringing the 777X to market," said Boeing Commercial Airplanes President and CEO Ray Conner. "We wouldn't be in this position without the support of our teammates and partners throughout the Puget Sound region and in Olympia – we owe them all a debt of gratitude."

Completion of the new building, which is expected in May 2016, will require approximately 3.5 million hours of work. At its peak, there will be approximately 1,200 contract employees working on the project. By the numbers, the new building will require:

  • 31,000 tons of steel
  • 480 miles of electrical cable
  • 80,000 linear feet of process piping
  • 530,000 cubic yards of fill material
  • 170,000 tons of concrete

To date, the 777X has accumulated 300 orders and commitments. Two models will comprise the 777X family – the 777-8X, with approximately 350 seats and a range capability of more than 9,300 nautical miles; and the 777-9X, with approximately 400 seats and a range of more than 8,200 nautical miles. The 777-8X competes directly with the Airbus A350-1000, while the 777-9X is in a class by itself, serving a market segment that no other airplane can. First delivery of the 777X is targeted for 2020.

(Images provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (04.20.24): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.21.24)

Aero Linx: JAARS, Inc. For decades now, we’ve landed planes on narrow rivers and towering mountains. We’ve outfitted boats and vehicles to reach villages that rarely se>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

ANN's Daily Aero-Term (04.21.24): Aircraft Conflict

Aircraft Conflict Predicted conflict, within EDST of two aircraft, or between aircraft and airspace. A Red alert is used for conflicts when the predicted minimum separation is 5 na>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC