Arianespace's Year-Ending Flight Is Cleared For Its December 19 Liftoff | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Recent Daily Episodes

Episode Date

Monday

Tuesday

Wednesday

Thursday

Friday

Airborne On ANN

Airborne 03.23.15

Airborne 03.24.15

Airborne 03.25.15

Airborne 03.26.15

Airborne 03.27.15

Airborne Hi-Def On YouTube

Airborne 03.23.15

Airborne 03.24.15

Airborne 03.25.15

Airborne 03.26.15

Airborne 03.27.15

Wed, Dec 19, 2012

Arianespace's Year-Ending Flight Is Cleared For Its December 19 Liftoff

Ariane Flight VA211 Will Launch Satellites For The Mexican Government

Arianespace’s seventh and final Ariane 5 launch of 2012 is "go" for liftoff following a successful launch readiness review performed at the Spaceport in French Guiana. The review is held prior to each Ariane 5 mission, ensuring that the heavy-lift launch vehicle and its payload are flight-ready, along with the Spaceport’s infrastructure and the network of downrange tracking stations.

This approval cleared the way for Ariane 5’s rollout from the Final Assembly Building to Ariane Launch Complex No. 3 at the Spaceport – positioning it for liftoff on Wednesday, December 19 during a launch window that opens at 1849 and continues to 2008 local time in French Guiana.
 
This flight will orbit a dual-passenger payload of the Mexsat Bicentenario telecommunications satellite for the Mexican Secretariat of Communications and Transport, along with the Skynet 5D secure military communications relay platform for the European operator Astrium Services, on behalf of the British Ministry of Defence.
 
Skynet 5D was built by Astrium Satellites of Stevenage, England, and will be the 38th military payload lofted by the Ariane launcher family.  Based on the Eurostar E3000 platform, it has an expected lifetime of 15 years and will be the 89th Astrium satellite launched by Arianespace. The spacecraft will be operated from a geostationary orbital position of 25 deg. East following its deployment.
 
Mexsat Bicentenario was built by Orbital Sciences Corporation, based on its GEOStar-2 platform. This will be the fifth Mexican satellite launched by Ariane and the 23rd Orbital-built satellite to be transported by Arianespace. The spacecraft has a design lifetime of 16 years.  It will be positioned in geostationary orbit at 114.9 deg. West to provide communication services to Mexico and its surrounding waters.
 
This year-ending Ariane 5 mission is designated VA211 in Arianespace’s flight numbering system, signifying the 211th Ariane family liftoff from the Spaceport in French Guiana.

(File photo of Ariane 5 on launch pad)

FMI: www.arianespace.com

Advertisement

More News

For Real! HondaJet Receives Provisional TC From FAA

Next Big Step Taken In Honda's Plans For The Business Aviation Market The HondaJet has received provisional type certification (PTC) from the FAA. This achievement indicates the FA>[...]

Klyde Morris (03.30.15)

Klyde's Got Worries... Lots Of Them FMI: www.klydemorris.com>[...]

AeroSports Update: Aerobatic Powerhouse Julie Clark To Be At Sun ‘N Fun

Even The Best Airshow Performers In The World Need Sponsorships, And Julie Clark Has Just Announced She Will Be Sponsored By Tempest And Electroair At Sun-N-Fun 2015 Julie Clark Ai>[...]

Airborne 03.27.15: Cockpit Changes Announced, Maine v UAVs, NBAA v Santa Monica

Also: AirVenture Update, Barnstorming Opines On Media Aero-Reporting, NTSB Update, ERAU Scholarships, Doolittle Raiders, Tecnam P2010 The loss of Germanwings Flight 9525 due to wha>[...]

Aero-News: Quote Of The Day (03.30.15)

“EAA AirVenture creates unmatched opportunities for people to see aircraft in one place that you cannot see anywhere else in the world. It’s only fitting that on the B->[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2015 Web Development & Design by Pauli Systems, LC