Rockwell Collins Gets Green Light For C/KC-135 GATM Upgrade | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Apr 07, 2004

Rockwell Collins Gets Green Light For C/KC-135 GATM Upgrade

Deliveries Set For April 2005

The US Air Force has authorized Rockwell Collins to begin the $36.9M Lot II, the first phase of full rate production, as part of the C/KC-135 Global Air Traffic Management (GATM) program.  This first production phase calls for the building, delivery and installation of 30 additional R-model aircraft ship sets with deliveries beginning in April 2005.  If fully executed, the GATM program could generate $600 million in revenue for Rockwell Collins.

"We are proud of this milestone and look forward to continued success with the C/KC-135 GATM program," said Rockwell Collins Chairman, President and Chief Executive Officer Clay Jones. "This milestone is a reflection of our ongoing commitment to meet budget and schedule targets for government projects."

Last summer, Rockwell Collins officials presented the US Air Force with the first C/KC-135 production aircraft equipped with Global Air Traffic Management (GATM) technology during a ceremony in San Antonio.

Prior to this first production authorization, the $55 million Phase 1 low-rate initial production option included delivery and installation of avionics for 50 C/KC-135 tanker/transport aircraft.  The Air Force then authorized the $32 million second phase of low-rate initial production as part of the GATM program. The second phase called for the building, delivery and installation of 25 additional R-model aircraft ship sets.

As the prime avionics systems integrator for the US Air Force C/KC-135 GATM program, Rockwell Collins is providing technology that prepares aircraft for changing communication/navigation/surveillance and air traffic management (CNS/ATM) requirements as the airspace transitions to Free Flight operation.

FMI: www.rockwellcollins.com

Advertisement

More News

SpaceX to Launch Inversion RAY Reentry Vehicle in Fall

Inversion to Launch Reentry Vehicle Demonstrator Aboard SpaceX Falcon 9 This fall, the aerospace startup Inversion is set to launch its Ray reentry demonstrator capsule aboard Spac>[...]

Aero-News: Quote of the Day (04.23.24)

"We are excited to accelerate the adoption of electric aviation technology and further our journey towards a sustainable future. The agreement with magniX underscores our commitmen>[...]

Aero-News: Quote of the Day (04.20.24)

"The journey to this achievement started nearly a decade ago when a freshly commissioned Gentry, driven by a fascination with new technologies and a desire to contribute significan>[...]

ANN's Daily Aero-Linx (04.20.24)

Aero Linx: OX5 Aviation Pioneers Each year a national reunion of OX5 Aviation Pioneers is hosted by one of the Wings in the organization. The reunions attract much attention as man>[...]

Aero-News: Quote of the Day (04.21.24)

"Our driven and innovative team of military and civilian Airmen delivers combat power daily, ensuring our nation is ready today and tomorrow." Source: General Duke Richardson, AFMC>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC